About the project

Development of complete design documentation for the construction of a pedestrian path along National Road 9 in the villages of Pęchów and Klimontów, including obtaining the final decision permitting road investment (ZRID) and providing author supervision during construction.

Scope of work

Development of complete design documentation for a pedestrian path along National Road 9, including construction/renovation of pedestrian paths, driveways, drainage systems, culverts, traffic safety devices, technological channels, and potential relocation of conflicting networks. The documentation must comply with legal regulations and guidelines from the General Director of National Roads and Motorways (GDDKiA). The contractor is also required to obtain the final decision permitting road investment (ZRID) and provide author supervision during construction.

Deliverables

  • Complete design documentation for pedestrian path construction
  • Final decision permitting road investment (ZRID) or effective notification of construction works under the Building Law
  • Author supervision during construction

Required services

  • Architectural and engineering design services
  • Geotechnical engineering services
  • Mapping services
  • Project supervision and documentation management

Pelenoir assessment

The project primarily involves engineering and technical planning for the design of a pedestrian path along a national road, including structural, drainage, and safety elements. Secondary disciplines include urban design for spatial integration and surveying/geomatics for site analysis and geotechnical support. The scope is firmly grounded in infrastructure design with no architectural or interior design components.

  • Design and technical planning for the pedestrian path, including structural elements (culverts, drainage systems), road safety devices, technological channels, and coordination with existing infrastructure (e.g., potential relocation of conflicting networks). Compliance with GDDKiA guidelines and legal regulations for road design.

  • Integration of the pedestrian path into the existing urban and rural context of Pęchów and Klimontów, including spatial planning for accessibility, connectivity, and public-realm improvements along National Road 9.

  • Surveying 10%

    Geotechnical surveys, mapping, and measurement services to support the design and construction of the pedestrian path, including site analysis and preparation of geodata for drainage and structural elements.

How to take part

Who can apply

  • Contractor must demonstrate experience in delivering at least one design documentation for a road or street of minimum class G, resulting in a ZRID or building permit decision within the last 5 years
  • The designated Road Designer (Lead Designer) must hold unlimited engineering design qualifications in the road specialty or equivalent valid qualifications issued under previous regulations
  • The designated Road Designer must have experience in preparing at least one design documentation for a road or street of minimum class G, resulting in a ZRID or building permit decision, as a Road Designer or Documentation Reviewer

What to submit

  • Completed offer form (Annex 1 to SWZ) including non-price criteria form and price form
  • Statement under art. 125(1) of the Polish Public Procurement Law regarding compliance with participation conditions
  • List of services performed in the last 5 years with references or equivalent documents
  • List of personnel assigned to the project, including their professional qualifications, experience, and education relevant to the project

Award criteria

  • Price (60% weight)
  • Professional experience of the Road Designer (40% weight)

Source

Published on e-Zamowienia. Original title: ”Budowa drogi dla pieszych na DK 9 w miejscowościach Pęchów i Klimontów – opracowanie dokumentacji”.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 16 Sep 2026.