About the project

Preparation of complete multi-discipline design and cost documentation, including architectural, construction, technical and execution designs, cost estimates, bills of quantities, and technical specifications for the construction of a new road on ul. W. Pola in Osiedle Górków district. The project also requires obtaining two administrative decisions to enable the start of construction works: a building permit and/or a road investment implementation permit (ZRID).

Scope of work

Preparation of complete multi-discipline design and cost documentation for a new road, including concept design with preliminary cost estimate, architectural and construction design, site development plan with technical branch designs, execution designs, investor cost estimates, bills of quantities, and technical specifications for execution and acceptance of construction works (STWiORB). The project requires obtaining two administrative decisions: a building permit and/or a road investment implementation permit (ZRID). The contractor must also provide qualified personnel with specified professional licenses and experience.

Deliverables

  • Concept design with preliminary cost estimate
  • Architectural and construction design
  • Site development plan with technical branch designs (thermal, ventilation, gas, water, sewage, electrical, telecommunication)
  • Execution designs
  • Investor cost estimates and bills of quantities for each branch
  • Technical specifications for execution and acceptance of construction works (STWiORB)
  • Two administrative decisions enabling the start of construction works: building permit and/or road investment implementation permit (ZRID)

Required services

  • Civil engineering design
  • Road design
  • Architectural design
  • Technical branch designs (thermal, ventilation, gas, water, sewage, electrical, telecommunication)
  • Cost estimation and quantity surveying
  • Preparation of technical specifications for construction works
  • Obtaining administrative decisions (building permit, ZRID)

Pelenoir assessment

This project focuses on the design and documentation of a new urban road, requiring a multi-discipline approach. The primary scope is engineering and technical planning for civil and infrastructure works, including road design and technical branch systems. Architectural design for site development and project management tasks (cost estimation and administrative approvals) are also explicitly supported by the project scope.

  • Civil engineering, road design, technical branch designs (thermal, ventilation, gas, water, sewage, electrical, telecommunication), structural and infrastructure engineering, and preparation of execution designs and technical specifications for construction works.

  • Architectural and construction design for the road infrastructure, including site development plans and integration of technical branches into the overall design.

  • Preparation of cost estimates, bills of quantities, and obtaining administrative decisions (building permit and/or road investment implementation permit - ZRID) to enable the start of construction works.

How to take part

Who can apply

  • Contractor must demonstrate experience in designing at least one road construction, expansion, reconstruction, or renovation project with obtained administrative approval (building permit or equivalent) within the last five years
  • Contractor must provide qualified personnel: a road design coordinator with unlimited road design license and minimum 3 years of professional experience, and designers with unlimited licenses in thermal, ventilation, gas, water, sewage, electrical, and telecommunication installations, each with minimum 2 years of professional experience
  • Contractor must provide personnel to verify each branch design, with qualifications and experience equal to or exceeding those of the designers
  • Contractors jointly applying must demonstrate that at least one member meets the experience and personnel requirements
  • Contractors must submit required documents: company registry excerpts, statements on exclusion criteria, declarations on financial and technical capacity, and personnel qualifications

What to submit

  • Offer form (Załącznik Nr 1 do SWZ)
  • Statement on non-exclusion and fulfillment of participation conditions
  • Power of attorney (if applicable)
  • Commitment of resource-sharing entity (if applicable)
  • Bid bond (wadium)
  • Confidentiality statement (if applicable)
  • List of executed services with references (Załącznik Nr 4 do SWZ)
  • List of personnel with qualifications and experience (Załącznik Nr 5 do SWZ)
  • For joint contractors: statement on division of works (Załącznik Nr 9 do SWZ)

Award criteria

  • Price (80% weight)
  • Professional qualifications and experience of the designated road design coordinator (20% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie kompletnej dokumentacji projektowo-kosztorysowej (pełnobranżowej) (...) na potrzeby realizacji zadania pn. „Os. Górków – drogi” – budowa drogi ul. W. Pola – dokumentacja projektowa.