Tenders of Europe project card: New nursery school with four departments in Sveio town centre, Sveio, Norway
Featured in the daily edition, 26 Nov 2026

About the project

Construction of a new nursery school in Sveio town centre with approximately 800 m² area, including three regular departments and one adapted department. The project is procured as a design-build competition with negotiation after pre-qualification, requiring solution proposals as part of the tender.

Why it matters

One adapted department in an 800 m² nursery school drafts the spatial rules for the entire layout. A quiet constraint for daily use.

The Sveio nursery school brief specifies one adapted department within an 800 m² layout. But the entire design must follow its spatial requirements.

This isn’t just an accessibility checkbox. It’s a quiet rulebook for the whole building, forcing architects to rethink circulation, sightlines, and daily use from the ground up.

Scope of work

Design and construction of a new nursery school with approximately 800 m² area, including three regular departments and one adapted department. The tender requires solution proposals as part of the submission, following a pre-qualification and negotiation process.

Deliverables

  • solution proposals for the nursery school design and construction

Required services

Pelenoir assessment

The project is a design-build competition for a new nursery school in Sveio, requiring integrated architectural design, engineering, and construction services. The primary focus is on architectural concept and building design, with secondary support from engineering and technical planning, and a smaller scope for construction delivery under the totalentreprise model.

  • Architectural concept and building design for the new nursery school, including spatial organization, functional layout, and aesthetic development of the approximately 800 m² facility with three regular departments and one adapted department.

  • Structural, civil, and building-services engineering for the nursery school, including technical planning, infrastructure integration, and compliance with regulatory requirements for educational buildings.

  • Physical construction and installation of the nursery school, including coordination of trades, site management, and delivery of the completed facility under a design-build contract.

How to take part

Who can apply

  • pre-qualification required
  • maximum of 5 candidates invited to the second stage of the procedure

What to submit

  • electronic submission of tenders
  • tenders must be in Norwegian
  • electronic catalogues permitted

Source

Published on Doffin. Original title: Sveio barnehage.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 26 Nov 2026.