About the project

Construction of a new 4,750 m² primary school building in two phases: Phase 1 includes the new school building and adjacent outdoor areas; Phase 2 involves demolition of existing buildings (except one wing) and creation of parking, bus lay-by and new outdoor spaces. The school remains operational throughout construction. The contract covers both design and execution under a turnkey agreement (NS 8407:2011), including takeover of the client's architect and fire consultant.

Scope of work

Turnkey contract (totalentreprise) for design and construction of a new 4,750 m² primary school in two phases, including demolition of existing buildings, landscaping, parking and outdoor areas. The school remains operational during construction. The contractor takes over the client's architect and fire consultant. Optional works include steel structural system, solar panels, roof rails, personnel lift, ball nets, sedum roof, turf and grass cover on a seven-a-side pitch.

Deliverables

  • new 4,750 m² primary school building
  • demolition of existing buildings (except one wing)
  • landscaping and outdoor areas
  • parking and bus lay-by
  • optional works as described in tender documents

Required services

  • design (prosjektering)
  • construction (utførelse)
  • quality assurance (ISO 9001 or equivalent)
  • environmental management (ISO 14001, Miljøfyrtårn, EMAS or equivalent)

Pelenoir assessment

The project is a turnkey (totalentreprise) contract for the design and construction of a new primary school, covering architectural design, engineering, physical construction, and landscaping. The primary focus is on architectural and technical design (ARCHITECTURE_AND_DESIGN, ENGINEERING_AND_TECHNICAL_PLANNING), followed by execution (CONSTRUCTION_AND_GENERAL_CONTRACTING) and outdoor environment design (LANDSCAPE_ARCHITECTURE). The contractor's responsibility for both design and construction under NS 8407:2011 justifies the multi-disciplinary scope.

  • Architectural design of the new 4,750 m² primary school building, including conceptual and detailed design under the turnkey contract. The contractor will take over the client's architect and integrate their work into the final design.

  • Structural, civil, and building-services engineering for the new school building, including technical planning for demolition, landscaping, parking, and outdoor areas. Coordination of fire safety requirements with the client's fire consultant.

  • Physical construction of the new school building, demolition of existing structures (except one wing), and execution of outdoor areas, parking, and bus lay-by under the turnkey agreement.

  • Design and execution of outdoor spaces, including landscaping, parking, bus lay-by, and recreational areas adjacent to the new school building.

How to take part

Who can apply

  • legally established company
  • tax and VAT compliance certificate (Norwegian suppliers)
  • credit rating of A or better (Proff Forvalt)
  • minimum annual turnover of NOK 180 million for the last two financial years
  • experience from at least one comparable turnkey contract (minimum NOK 80 million) completed in the last five years
  • quality assurance system for design and execution
  • environmental management system for contract execution

What to submit

  • firm certificate (Norwegian suppliers) or equivalent registration confirmation (foreign suppliers)
  • tax and VAT compliance certificate (Norwegian suppliers)
  • description of up to three reference projects
  • confirmation of financial capacity
  • quality assurance certificate (ISO 9001) or description of system
  • environmental management certificate (ISO 14001, Miljøfyrtårn, EMAS) or description of measures

Award criteria

  • Price (50%)
  • Solution proposal (30%)
  • Project-specific competence (20%)