About the project

Overarching pre-project to ensure proper planning and documentation for future measures at Lenvik, Rossfjord and Torsken churches. The projects are supported by the Church Preservation Fund and must comply with requirements for an overarching pre-project.

Scope of work

Overarching pre-project for three historic churches (Lenvik, Rossfjord, Torsken) to produce planning and documentation for future measures. The project must comply with requirements for an overarching pre-project and is supported by the Church Preservation Fund.

Deliverables

  • feasibility study
  • planning documentation
  • cost estimates
  • project and design preparation

Required services

Pelenoir assessment

This project is primarily an architectural and design-focused pre-project for three historic churches, with a strong emphasis on heritage-sensitive planning and documentation. Engineering and technical planning are secondary but critical for structural and infrastructure assessments. Specialist consultancy is also required to ensure compliance with preservation standards and ecclesiastical requirements.

  • Architectural concept, building design, and heritage-sensitive planning for the three historic churches (Lenvik, Rossfjord, and Torsken). This includes assessing structural and aesthetic integrity, compliance with preservation requirements, and preparing design documentation for future measures.

  • Structural, civil, and technical engineering assessments for the churches, including stability, infrastructure, and building-services evaluations. This may involve condition surveys, load calculations, and technical feasibility studies to support preservation measures.

  • Heritage-specific consultancy, including compliance with preservation standards, cost estimation, and project preparation advice tailored to ecclesiastical and cultural heritage requirements.

How to take part

What to submit

  • tenders must be submitted electronically
  • tenders must be valid for 86 days
  • e-invoicing is mandatory

Source

Published on Doffin. Original title: Overordnet forprosjekt - kirkebygg Senja kirkelige fellesråd.

Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.