Architecture · Works contract
Fløysbonn Secondary School Construction and Demolition
Construction of a new 8-parallel secondary school with capacity for approximately 720 students and 90 staff, including demolition of the existing 1970s Fløysbonn secondary school, site preparation, infrastructure, and landscaping.
- Deadline
- 22 days left to apply
- Location
- Ski, Akershus, Norway
- Declared value
- NOK 400 m (≈ EUR 37.3 m)
About the project
Construction of a new 8-parallel secondary school with capacity for approximately 720 students and 90 staff, including demolition of the existing 1970s Fløysbonn secondary school, site preparation, infrastructure, and landscaping. The project also involves building a new access road to Sofiemyrhallen and ensuring operational continuity of existing facilities during construction.
Scope of work
Construction of a new 8,500 m² secondary school with three wings and central communication areas, demolition of the existing school, site infrastructure including a new access road, parking areas, stormwater management, and landscaping. The project includes optional works such as energy central upgrades, ventilation systems, solar panels, and low-carbon concrete.
Deliverables
- New 8,500 m² secondary school building
- Demolition of existing Fløysbonn secondary school
- New access road to Sofiemyrhallen
- Parking areas and infrastructure
- Stormwater management systems
- Landscaping and outdoor areas
- Optional works: energy central, ventilation systems, solar panels, low-carbon concrete
Required services
- Construction works
- Architectural and engineering services
- Planning services
- Demolition works
- Site preparation and infrastructure
Pelenoir assessment
This project primarily involves the architectural design and engineering of a new secondary school, alongside significant construction and demolition works. The scope also includes landscape architecture for outdoor areas and site infrastructure. The project is classified as a construction works procurement with a strong emphasis on architectural and technical planning, supported by the explicit mention of design, engineering, and landscaping deliverables.
-
Architecture 40%
Architectural design of the new 8,500 m² secondary school building, including conceptual and detailed design for the three wings and central communication areas, as well as coordination with engineering disciplines.
-
Engineering 30%
Structural, civil, and building-services engineering for the new school, including infrastructure such as stormwater management, energy central upgrades, ventilation systems, and low-carbon concrete specifications.
-
Physical construction of the new school building, demolition of the existing school, site preparation, and execution of infrastructure works such as the new access road and parking areas.
-
Design and implementation of outdoor areas, landscaping, and integration of the new school building with its surroundings, including stormwater management and site aesthetics.
How to take part
Who can apply
- Registration in a trade or commercial register
- Minimum average annual turnover of NOK 700,000,000 for the last 3 years
- Bankruptcy rating equivalent to A (low risk) or better from Proff Forvalt
- Experience from comparable school construction projects (2 references required)
- ISO 9001:2015 quality management certification
- ISO 14001:2015 or EMAS environmental management certification
- Compliance with Norwegian public procurement regulations
What to submit
- Completed V05 price form
- Completed V07 CV form for 4 key personnel (Project Leader, Construction Leader, Design Group Leader, ITB Coordinator)
- Completed V08 reference questionnaire for both reference projects
- Documentation of trade register enrollment
- Financial statements for the last 3 years
- Evidence of quality and environmental management certifications
Award criteria
- Price (70% weight)
- Competence and experience of key personnel (30% weight)
Source
Published on Doffin. Original title: Fløysbonn ungdomsskole.
Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

