About the project

Construction of approximately 3,850 meters of new blue-graded mountain bike trail from Utsikten to Vassfarvegen in Nesbyen, including drainage solutions, erosion control, terrain rehabilitation, and signage. The project also includes design services and must comply with national guidelines for bike trail grading.

Scope of work

Design and construction of a new 3,850-meter blue-graded mountain bike trail, including drainage, erosion control, terrain rehabilitation, and signage. Compliance with national bike trail grading guidelines is required.

Deliverables

  • 3,850 meters of new blue-graded mountain bike trail
  • drainage solutions
  • erosion control measures
  • terrain rehabilitation after construction
  • signage

Required services

  • design services (prosjektering)
  • construction services

Pelenoir assessment

This project primarily involves the design and construction of a blue-graded mountain bike trail, with a focus on technical planning (e.g., drainage, erosion control) and physical construction. The scope supports both engineering and technical planning as the primary discipline, with construction and general contracting as a secondary component.

  • Design and technical planning of the 3,850-meter blue-graded mountain bike trail, including drainage solutions, erosion control measures, and compliance with national bike trail grading guidelines.

  • Physical construction of the mountain bike trail, including terrain grading, installation of drainage systems, erosion control measures, signage, and terrain rehabilitation.

How to take part

Who can apply

  • Compliance with Norwegian public procurement regulations
  • Ability to meet exclusion criteria related to financial, legal, and professional conduct

What to submit

  • Electronic submission via e-Tendering platform
  • Tender documents in Norwegian

Award criteria

  • Price (20%)
  • Quality (50%)
  • Environmental considerations (30%)

Tender documents

The visible document package includes a PDF file titled '4795_sykkelmanual_04.pdf,' which likely contains national guidelines for grading and designing bike trails, as referenced in the tender. The second item is a web link labeled 'description,' which probably directs to the tender's detailed project description or procurement documents. The files are expected to provide technical specifications, design standards, and procedural requirements for the bike trail construction. However, the exact content of the PDF cannot be confirmed without access, and the web link's destination remains unverified.

Source

Published on Doffin. Original title: Totalentreprenør for bygging av blå terrengsykkelsti.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 10 Sep 2026.