About the project

Widening of approximately 550 meters of existing road (Rv.13) from 6.5 meters width, including avalanche protection for 150 meters and retaining most of the current road structure. The project involves both design and construction under a turnkey contract.

Scope of work

Turnkey contract for design and construction of road widening, including avalanche protection and traffic management during construction. The project requires engineering, construction, and environmental mitigation services.

Deliverables

  • Widened road section (6.5 meters)
  • Avalanche protection for 150 meters
  • Retained existing road structure
  • Traffic management solutions during construction

Required services

  • engineering design
  • construction
  • geotechnical services
  • environmental consulting
  • traffic management planning

Pelenoir assessment

This project is primarily a civil infrastructure initiative focused on road widening, avalanche protection, and traffic management. The scope is dominated by engineering and technical planning, with significant construction work under a turnkey contract. Environmental consulting is also required but represents a smaller share of the project scope.

  • Structural, civil, and geotechnical engineering design for road widening, avalanche protection, and retaining existing road structures. Includes technical planning for traffic management during construction.

  • Physical construction of the widened road section, avalanche protection, and implementation of traffic management solutions during construction.

  • Environmental consulting and mitigation measures to address project-specific challenges, such as avalanche protection and traffic management.

How to take part

Award criteria

  • Price (Tilbudssum)
  • Plan for implementation (Plan for gjennomføring)
  • Reduction of greenhouse gas emissions (Reduksjon av klimagassutslipp)

Source

Published on Doffin. Original title: Rv.13 Freim - Djupvik.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 22 Sep 2026.