Engineering · Study
Feasibility study: raising a WWII submarine wreck with hazardous cargo
Raising a WWII submarine wreck: where hazardous cargo dictates every engineering decision.
- Deadline
- 20 days left to apply
- Location
- Norway
- Declared value
- NOK 2 m (≈ EUR 186 306)
About the project
A feasibility study to assess technical solutions for raising the WWII German submarine U-864, including its cargo and/or the removal of torpedoes. The study will evaluate operational, environmental and safety challenges, propose execution strategies, and provide cost and duration estimates for the operation.
Why it matters
Raising a WWII submarine wreck with hazardous cargo requires assessing operational, environmental, and safety challenges. A defining constraint for engineers.
Scope of work
The supplier is required to conduct a feasibility study for raising the submarine wreck U-864, including its cargo, and/or the removal of torpedoes. The study must assess technical, operational, environmental and safety challenges, propose execution strategies, and provide cost and duration estimates. The supplier may suggest alternative technical approaches if deemed appropriate.
Deliverables
- Feasibility study report assessing technical solutions for raising the wreck and/or removing torpedoes
- Evaluation of operational, environmental and safety challenges
- Proposed execution strategies for the operation
- Cost and duration estimates for the operation
- Risk assessment for the proposed methods
Required services
- Engineering consultancy
- Feasibility study and analysis
- Geotechnical engineering services
- Technical surveys
- Research and experimental development
- Environmental consultancy
Pelenoir assessment
The project is a feasibility study focused on assessing technical and operational solutions for raising a WWII submarine wreck with hazardous cargo. The primary AEC business group is ENGINEERING_AND_TECHNICAL_PLANNING, supported by SPECIALIST_CONSULTING for environmental and safety assessments and SURVEYING_AND_GEOMATICS for geotechnical and spatial data collection. The scope does not include architectural design, construction, or real-estate development.
-
Engineering 70%
Technical solutions for raising the submarine wreck U-864, including structural engineering, marine engineering, and infrastructure planning to address operational, environmental, and safety challenges. The focus includes evaluating geotechnical conditions, proposing execution strategies, and delivering cost and duration estimates for the operation.
-
Environmental risk assessment, feasibility analysis, and research and experimental development related to the submarine wreck's hazardous cargo and operational safety. This includes evaluating environmental impacts and proposing mitigation strategies.
-
Surveying 10%
Geotechnical surveys and measurements to assess the wreck's condition, seabed stability, and spatial data required for planning the raising operation. This includes technical surveys referenced in the tender's required services.
How to take part
What to submit
- Tenders must be submitted electronically in Norwegian
Source
Published on Doffin. Original title: Anskaffelse av mulighetsstudie for vurdering av heving av U-864.
Summary and assessment prepared by Pelenoir from the public notice (16 Nov 2026). The original notice and its documents are binding. Page updated 16 Nov 2026.