About the project

Technical pre-project for the expansion of Verftsbrua bridge in Trondheim, including design proposals for widening the existing bridge, potential connection to a new pedestrian and cycle bridge over Rosenborgbassenget, adaptation of landing areas, structural design, foundation, material selection, and cost estimates. The pre-project will serve as the basis for detailed planning or regulatory planning.

Scope of work

Technical pre-project for the expansion of Verftsbrua bridge, including design proposals for widening, structural and foundation design, material selection, cost estimates, and adaptation of landing areas. The project includes two optional tasks: marine geotechnical investigations (including environmental geology) and an alternative bridge design without connection to Rosenborgbassenget.

Deliverables

  • Pre-project report with design proposals for bridge expansion
  • Cost estimates
  • Structural and foundation design
  • Material selection proposals
  • Adaptation plans for landing areas
  • Optional: Marine geotechnical investigations (including environmental geology)
  • Optional: Alternative bridge design without connection to Rosenborgbassenget

Required services

Pelenoir assessment

This project is primarily focused on technical and engineering aspects of a bridge expansion, including structural design, foundation, and material selection. Architectural design and landscape architecture are secondary but explicitly supported by the project scope, particularly for design proposals and adaptation of landing areas.

  • Structural and foundation design for the bridge expansion, including material selection, technical engineering, and adaptation of landing areas. This also covers electromechanical engineering aspects of the bridge.

  • Architectural design proposals for the bridge expansion, including conceptual design for widening the existing bridge and potential connection to a new pedestrian and cycle bridge over Rosenborgbassenget.

  • Design and adaptation of landing areas and integration of the bridge expansion with the surrounding outdoor environment, including potential connections to pedestrian and cycle pathways.

How to take part

Who can apply

  • Suppliers must demonstrate professional, technical, and economic capacity to fulfill the contract
  • Key personnel must have relevant education and experience
  • Reference projects for key personnel must not be older than 7 years

What to submit

  • Completed remuneration form with hourly rates and option prices
  • Competence note (max 6 A4 pages, font size 11)
  • CVs for key personnel
  • Organizational plan (max 1 A4 page)
  • Task understanding note (max 8 A4 pages, font size 11)
  • Progress plan with milestones
  • KTR-sheet (max 4 A3 pages, font size 11)

Award criteria

  • Price (30% weight): Based on completed remuneration form and estimated costs for reservations
  • Competence (30% weight): Based on competence note, CVs, and reference projects for key personnel
  • Task understanding (40% weight): Based on task understanding note, progress plan, and KTR-sheet

Source

Published on Doffin. Original title: Kontraktstildeling - 94106070 teknisk forprosjekt for utvidelse av Verftsbrua - 2.gangsutlysning.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 9 Jul 2026.