About the project

Update of the risk and vulnerability analysis (ROS-analyse) and the 2017 environmental impact assessment for the Fremo drinking water source as part of the revision of Melhus municipality's land-use plan.

Scope of work

Conduct a risk and vulnerability analysis (ROS-analyse) compliant with the Planning and Building Act §4-3, and update the 2017 environmental impact assessment for the Fremo groundwater source. The work supports the revision of Melhus municipality's land-use plan.

Deliverables

  • Updated risk and vulnerability analysis (ROS-analyse)
  • Updated environmental impact assessment for Fremo groundwater source

Required services

  • infrastructure consulting
  • technical planning services
  • urban and landscape planning
  • water supply and waste consulting
  • IT system planning
  • project management consulting
  • quality assurance planning for systems
  • research and development consulting

Pelenoir assessment

This project primarily involves engineering and technical planning for updating risk and vulnerability analyses and environmental impact assessments for a groundwater source, with secondary components in urban planning and specialist consulting. The scope is focused on technical and environmental planning services supporting municipal land-use planning.

  • Technical planning and engineering services for the risk and vulnerability analysis (ROS-analyse) and environmental impact assessment update for the Fremo groundwater source, including infrastructure consulting and water supply technical planning.

  • Support for the revision of Melhus municipality's land-use plan, including spatial planning and compliance with the Planning and Building Act §4-3.

  • Specialist advisory services for risk analysis, environmental impact assessments, and research and development consulting related to groundwater sources.

How to take part

What to submit

  • Electronic submission mandatory
  • Submission in Norwegian
  • Advanced or qualified electronic signature or seal required (as defined in Regulation (EU) No 910/2014)

Source

Published on Doffin. Original title: ROS-analyse og oppdatering av konsekvensutredning for grunnvannskilden Fremo.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 22 Sep 2026.