Engineering · Service contract
Fremo groundwater source risk assessment and impact study update
Update of the risk and vulnerability analysis (ROS-analyse) and the 2017 environmental impact assessment for the Fremo drinking water source as part of the revision of Melhus municipality's land-use plan.
- Deadline
- 184 days left to apply
- Location
- Melhus, Trøndelag, Norway
About the project
Update of the risk and vulnerability analysis (ROS-analyse) and the 2017 environmental impact assessment for the Fremo drinking water source as part of the revision of Melhus municipality's land-use plan.
Scope of work
Conduct a risk and vulnerability analysis (ROS-analyse) compliant with the Planning and Building Act §4-3, and update the 2017 environmental impact assessment for the Fremo groundwater source. The work supports the revision of Melhus municipality's land-use plan.
Deliverables
- Updated risk and vulnerability analysis (ROS-analyse)
- Updated environmental impact assessment for Fremo groundwater source
Required services
- infrastructure consulting
- technical planning services
- urban and landscape planning
- water supply and waste consulting
- IT system planning
- project management consulting
- quality assurance planning for systems
- research and development consulting
Pelenoir assessment
This project primarily involves engineering and technical planning for updating risk and vulnerability analyses and environmental impact assessments for a groundwater source, with secondary components in urban planning and specialist consulting. The scope is focused on technical and environmental planning services supporting municipal land-use planning.
-
Engineering 60%
Technical planning and engineering services for the risk and vulnerability analysis (ROS-analyse) and environmental impact assessment update for the Fremo groundwater source, including infrastructure consulting and water supply technical planning.
-
Support for the revision of Melhus municipality's land-use plan, including spatial planning and compliance with the Planning and Building Act §4-3.
-
Specialist advisory services for risk analysis, environmental impact assessments, and research and development consulting related to groundwater sources.
How to take part
What to submit
- Electronic submission mandatory
- Submission in Norwegian
- Advanced or qualified electronic signature or seal required (as defined in Regulation (EU) No 910/2014)
Source
Published on Doffin. Original title: ROS-analyse og oppdatering av konsekvensutredning for grunnvannskilden Fremo.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 22 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.