About the project

Modernization of the 25-year-old building management system (GLT-MSR) at the Pensionsversicherungsanstalt Rehabilitation Center in Alland, including replacement of outdated measurement, control, and regulation technology components. Electrical engineering measures are not included and will be procured separately.

Scope of work

First stage of a two-stage procurement process for the modernization of the building management system (GLT-MSR) at the RZ Alland Rehabilitation Center. This stage involves the selection of qualified bidders (Bewerberauswahl) for the subsequent submission of offers for GLT/MSR services. Electrical engineering measures are excluded and will be procured separately.

Deliverables

  • Modernized building management system (GLT-MSR)
  • Replacement of measurement, control, and regulation technology components

Required services

  • Installation of switchgear
  • Installation of measurement, control, and monitoring systems

Pelenoir assessment

This project focuses exclusively on the modernization of technical infrastructure, specifically the building management system (GLT-MSR) at a rehabilitation center. The scope is limited to engineering and technical planning tasks, with no indications of architectural design, interior fit-out, or other AEC disciplines.

  • Modernization of the building management system (GLT-MSR), including the replacement of measurement, control, and regulation technology components, as well as the installation of switchgear and monitoring systems.

How to take part

What to submit

  • Electronic submission of participation applications

Source

Published on Austrian Public Procurement Search. Original title: Pensionsversicherungsanstalt - RZ Alland - Modernisierung der Gebäudeleittechnik (GLT-MSR) (1.Stufe - Bewerberauswahl).

Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 27 Aug 2026.