Engineering · Works contract
River restoration: removing barriers to restore Vöckla river flow
Restoring the Vöckla river: where riverbed widening turns ecological continuity into daily flow.
- Deadline
- 12 days left to apply
- Location
- Frankenmarkt, Upper Austria, Austria
- Declared value
- EUR 3 m
About the project
Construction works to restore ecological continuity of the Vöckla river between kilometres 31.31 and 31.70, including removal of existing bed ramps, widening and redesign of the riverbed as a sequence of groynes, pools and fords, and implementation of bank and slope stabilisation as well as riverbank planting and ecological structuring measures, while protecting existing utilities.
Why it matters
Riverbed widening and groynes turn ecological continuity into daily flow, revealing how landscape architecture shapes seasonal rhythm.
The Vöckla river restoration brief specifies groynes, pools and fords to restore ecological continuity between kilometres 31.31 and 31.70.
Landscape architecture briefs today reveal how natural cycles shape the first quiet rules of daily use. The brief turns seasonal flow into a design constraint, not just a site condition.
Scope of work
Construction of river engineering works to restore ecological continuity of the Vöckla river, including removal of existing bed ramps, riverbed widening and redesign, bank and slope stabilisation, and ecological planting and structuring measures, while protecting existing utilities.
Deliverables
- Riverbed redesign as a groyne-pool-ford sequence
- Removal of existing bed ramps
- Bank and slope stabilisation
- Ecological structuring and planting measures
- Protection of existing utilities
Required services
- earthworks
- civil engineering
- water engineering
Pelenoir assessment
This project primarily involves engineering and technical planning for river restoration, including civil and water engineering works. Secondary disciplines include landscape architecture for ecological structuring and planting, as well as specialist consulting for ecological continuity and habitat restoration.
-
Engineering 70%
Structural, civil, and water engineering for riverbed redesign, removal of bed ramps, bank and slope stabilisation, and protection of existing utilities.
-
Ecological structuring, riverbank planting, and landscape integration to enhance biodiversity and natural aesthetics along the restored river section.
-
Advisory on ecological continuity, habitat restoration, and compliance with environmental regulations for river restoration projects.
How to take part
Who can apply
- Open to small and medium-sized enterprises (SMEs)
What to submit
- Tender documents in German
- Electronic submission required
- Names and professional qualifications of personnel to be specified
Award criteria
- Net total tender price (80% weighting)
- Shortening of construction time (10% weighting)
- Shortening of warranty period (10% weighting)
Source
Published on Austrian Public Procurement Search. Original title: Amt der Oö. Landesregierung Gewässerbezirk Gmunden.
Summary and assessment prepared by Pelenoir from the public notice (18 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
