Architecture · Service contract
LURI socio-cultural centre and collective housing
Design and execution management for two buildings on the same site: a 600 m² socio-cultural centre and a six-unit collective housing building.
- Deadline
- Closed 29 days ago
- Location
- LURI, Haute-Corse, France
About the project
Design and execution management for two buildings on the same site: a 600 m² socio-cultural centre and a six-unit collective housing building.
Scope of work
Design and execution management services for two buildings: a 600 m² socio-cultural centre and a six-unit collective housing building. The project includes all necessary studies, plans, and execution follow-up for both constructions.
Deliverables
- Design and execution plans
- Technical studies
- Execution follow-up documents
Required services
- Architectural design
- Engineering services
- Project management
- Execution supervision
Pelenoir assessment
The project primarily involves architectural design for two buildings—a socio-cultural centre and a collective housing block—with secondary requirements for engineering and technical planning, as well as project and construction management. The scope is focused on design and execution management, with no explicit signals for interior design, landscape, or other AEC disciplines.
-
Architecture 60%
Architectural design for both the 600 m² socio-cultural centre and the six-unit collective housing building, including conceptual and execution design, space planning, and aesthetic integration of the two structures on the same site.
-
Engineering 30%
Structural, civil, and building-services engineering for the socio-cultural centre and collective housing, including technical studies, execution plans, and coordination of engineering disciplines.
-
Project management and execution supervision for the construction of both buildings, including coordination of design and execution phases, timeline management, and client representation.
How to take part
Who can apply
- Minimum 3 and maximum 5 candidates will be shortlisted
- Candidates must meet standard public procurement exclusion and selection criteria
What to submit
- Electronic submission required (e-submission)
Source
Published on BOAMP. Original title: Maîtrise d'oeuvre conception-exécution réalisation 2 constructions sur le même terrain : bâtiment socio-culturel d'une surface d'environ 600 m², immeuble d'habitation collective de 6 logements.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 2 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


