Architecture · Service contract
Daycare centre: new 35-place nursery building
A new 35-place daycare centre: where functional and safe design drafts the first quiet rules of early childhood care.
- Deadline
- 20 days left to apply
- Location
- Salles-sur-l’Hers, Occitanie, France
- Declared value
- EUR 455 274
About the project
Construction of a new 35-place daycare centre (crèche / multi-accueil) including full architectural and engineering design services (maîtrise d’œuvre).
Why it matters
A new 35-place daycare centre in France requires functional and safe design for early childhood care, making this project a practical test of architectural and engineering collaboration.
Scope of work
Full architectural and engineering design services (maîtrise d’œuvre) for a new 35-place daycare centre, including all phases from design to construction supervision.
Deliverables
- Architectural and engineering design for a new building
- Construction documentation and supervision
Required services
- architectural design
- engineering design
- construction supervision
Pelenoir assessment
This project primarily involves the architectural design of a new 35-place daycare centre, supported by engineering and technical planning for structural and building-services aspects. Construction supervision is also included as a secondary component of the maîtrise d’œuvre services. The scope is focused on design and delivery of a public building with no indications of urban planning, interior fit-out, or specialist consulting beyond standard architectural and engineering disciplines.
-
Architecture 60%
Architectural concept, building design, and overall design coordination for the new 35-place daycare centre, including space planning and functional layout tailored to early childhood needs.
-
Engineering 30%
Structural, civil, and building-services engineering for the daycare centre, including technical planning for safety, accessibility, and compliance with public building regulations.
-
Construction supervision and project management to ensure compliance with design specifications, timelines, and quality standards during the building phase.
How to take part
Who can apply
- Exclusion grounds apply (Article L551-1, L551-13 and R551-7 of the French Administrative Justice Code)
- Selection criteria based on professional and technical capacity
- No reserved procurement
What to submit
- Electronic submission required
- Non-restricted tender documents available at the original notice
Award criteria
- Social criteria
- Environmental criteria
Source
Published on BOAMP. Original title: Maitrise d’oeuvre pour la construction d’une crèche / multi-accueil de 35 places sur la commune de Salles-sur-l’Hers.
Summary and assessment prepared by Pelenoir from the public notice (17 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
