Tenders of Europe project card: Daycare centre: new 35-place nursery building, Salles-sur-l’Hers, France
Featured in the daily edition, 17 Nov 2026

About the project

Construction of a new 35-place daycare centre (crèche / multi-accueil) including full architectural and engineering design services (maîtrise d’œuvre).

Why it matters

A new 35-place daycare centre in France requires functional and safe design for early childhood care, making this project a practical test of architectural and engineering collaboration.

Scope of work

Full architectural and engineering design services (maîtrise d’œuvre) for a new 35-place daycare centre, including all phases from design to construction supervision.

Deliverables

  • Architectural and engineering design for a new building
  • Construction documentation and supervision

Required services

Pelenoir assessment

This project primarily involves the architectural design of a new 35-place daycare centre, supported by engineering and technical planning for structural and building-services aspects. Construction supervision is also included as a secondary component of the maîtrise d’œuvre services. The scope is focused on design and delivery of a public building with no indications of urban planning, interior fit-out, or specialist consulting beyond standard architectural and engineering disciplines.

  • Architectural concept, building design, and overall design coordination for the new 35-place daycare centre, including space planning and functional layout tailored to early childhood needs.

  • Structural, civil, and building-services engineering for the daycare centre, including technical planning for safety, accessibility, and compliance with public building regulations.

  • Construction supervision and project management to ensure compliance with design specifications, timelines, and quality standards during the building phase.

How to take part

Who can apply

  • Exclusion grounds apply (Article L551-1, L551-13 and R551-7 of the French Administrative Justice Code)
  • Selection criteria based on professional and technical capacity
  • No reserved procurement

What to submit

  • Electronic submission required
  • Non-restricted tender documents available at the original notice

Award criteria

  • Social criteria
  • Environmental criteria

Source

Published on BOAMP. Original title: Maitrise d’oeuvre pour la construction d’une crèche / multi-accueil de 35 places sur la commune de Salles-sur-l’Hers.

Summary and assessment prepared by Pelenoir from the public notice (17 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.