About the project

Preparation of full design documentation for the construction of an integrated transport interchange in Sulechów, including a bus station with at least 5 stops, bicycle shelter, passenger shelter, car park with 50 spaces (including EV charging and disabled parking), taxi rank, bus charging station, road reconstructions, drainage, lighting, public toilets, ticket and parking machines, interactive information board, CCTV, street furniture, renewable energy installations, and landscaping. The design must ensure accessibility for people with disabilities and comply with universal design principles.

Scope of work

Preparation of comprehensive design documentation for the construction of an integrated transport interchange, including architectural, structural, electrical, and utility designs; detailed and simplified bills of quantities; cost estimates; geotechnical documentation; landscaping and tree felling/planting plans; traffic organisation plans; and all necessary documentation for obtaining building permits. The design must include accessibility features for people with disabilities and comply with universal design standards.

Deliverables

  • Building permit design documentation (3 copies)
  • Technical designs (3 copies)
  • Detailed bills of quantities (1 set)
  • Simplified bills of quantities (1 set)
  • Health and safety plan (1 copy)
  • Technical specifications for execution and acceptance of works (1 set)
  • Technological channel design (if necessary, 3 copies)
  • Tree felling and planting design (3 copies)
  • Permanent traffic organisation design (3 copies)
  • Cost estimates including investor’s simplified and detailed cost estimates, and contractor’s simplified cost estimates in XLS format (1 set each)
  • Geotechnical documentation (1 copy)
  • Map for design purposes at 1:500 scale (1 copy)

Required services

Pelenoir assessment

The project is a multi-disciplinary design effort for an integrated transport hub in Sulechów, combining architectural design for the bus station and shelters, engineering for structural and technical systems, urban design for traffic and road integration, and landscape architecture for outdoor spaces and planting. The scope is evenly distributed across these disciplines, with architectural design as the primary focus.

  • Architectural design of the integrated transport hub, including the bus station, passenger shelters, public toilets, and street furniture, ensuring compliance with universal design principles and accessibility standards.

  • Structural, electrical, and road engineering for the transport hub, including drainage, lighting, road reconstructions, EV charging infrastructure, and geotechnical documentation.

  • Urban integration of the transport hub, including traffic organisation plans, road reconstructions, and coordination of public spaces within the site.

  • Landscaping, tree felling and planting plans, and design of outdoor spaces such as bicycle shelters and renewable energy installations.

How to take part

Who can apply

  • Experience in designing roads of at least 300 metres with road lighting or bus stations with at least 5 stops within the last 5 years
  • Eligibility to participate in Polish public procurement procedures
  • Compliance with exclusion criteria under Polish and EU law (e.g., no support for aggression against Ukraine)

What to submit

  • Offer form (Załącznik nr 1 do SWZ)
  • Statement on exclusion criteria and eligibility (Załącznik nr 2 do SWZ)
  • Power of attorney (if applicable)
  • Bid bond documentation (if applicable)
  • Consortium agreement and declarations (if applicable)
  • Documentation demonstrating experience (e.g., references, contracts)
  • Documents in Polish language only

Award criteria

  • Price (60% weight)
  • Extension of warranty period beyond the required 36 months (40% weight)

Tender documents

The visible document package includes four files. 'SWZ .pdf' likely contains the full tender conditions, eligibility criteria, scope of work, and procedural rules for submission. 'Zał. nr 1, 2, 5 wersja edytowalna.doc' probably provides editable submission forms, including the offer form, eligibility statements, and digital accessibility requirements. 'Zał. nr 3- Projekt umowy.pdf' is expected to outline the draft contract terms, payment conditions, and project delivery requirements. 'Zał. nr 4- Koncepcja budowy Centrum Przesiadkowego.pdf' likely presents the preliminary design concept for the transport hub, including site plans, functional layouts, and urban integration proposals. The exact content of each file cannot be confirmed without access, and no file sizes are declared.

Source

Published on e-Zamowienia. Original title: Budowa zintegrowanego węzła przesiadkowego w Sulechowie – etap: dokumentacja projektowa.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.