Engineering · Service contract
Inspection of Hydroelectric Unit Construction with Report During Overhaul
Inspection of construction work on a hydroelectric unit (agregat) and preparation of a report during the overhaul and extended revision period.
- Deadline
- Closed 17 days ago
- Location
- Maribor, Podravska, Slovenia
About the project
Inspection of construction work on a hydroelectric unit (agregat) and preparation of a report during the overhaul and extended revision period.
Scope of work
Inspection of construction work on a hydroelectric unit and preparation of a detailed report during the overhaul and extended revision period. The contract includes analysis services and compliance with the tender documentation requirements.
Deliverables
- Inspection report of construction work on the hydroelectric unit (agregat)
Required services
- Analysis services
- Technical inspection
- Report preparation
Pelenoir assessment
This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING due to its focus on technical inspection, analysis, and reporting of construction work for a hydroelectric unit during an overhaul. The scope does not explicitly support additional AEC business groups, as it is limited to engineering and technical assessment services.
-
Engineering 100%
Technical inspection, analysis, and reporting of construction work on the hydroelectric unit, including structural and mechanical integrity assessments during the overhaul and extended revision period.
How to take part
Who can apply
- Electronic submission of offers is mandatory
- Minimum offer validity period of 120 days
- Suitable for small and medium-sized enterprises (SMEs)
What to submit
- Tender documentation as specified in the procurement notice
Award criteria
- Price (100%) as specified in the tender documentation
Tender documents
The visible ZIP file is titled 'RD Pregled gradbenega dela agregata.zip' and appears to contain the full tender documentation package for this procurement. Based on the filename and context, it likely includes the contract conditions, technical specifications for the inspection of the hydroelectric unit, and submission forms. The package may also contain instructions for offer preparation and evaluation criteria. However, the exact contents cannot be confirmed without accessing the file, and no additional details about the file structure or specific documents are provided.
Source
Published on eNaročanje. Original title: Pregled gradbenega dela agregata z izdelavo poročila v času remonta in podaljšane revizije.
Summary and assessment prepared by Pelenoir from the public notice (29 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.