About the project

Preparation of spatial and project documentation, including design supervision, for expansions, conversions and connections to the gas transmission pipeline system over a four-year period. The work covers projects defined in the Ten-Year Development Plan of the transmission pipeline network and its annual updates, including spatial planning, technical documentation, administrative permits and execution of investment, development and maintenance projects.

Scope of work

Deliverables

  • Spatial planning documentation (DPN)
  • Project documentation for pipeline expansions, conversions and connections
  • Design supervision for construction execution
  • Technical documentation for administrative permits
  • Documentation for investment, development and maintenance projects

Required services

  • Architectural and engineering design services
  • Spatial planning
  • Technical documentation preparation
  • Design supervision
  • Administrative permit coordination

Pelenoir assessment

This project primarily involves engineering and technical planning for gas transmission pipeline infrastructure, including spatial integration and design supervision. The scope is dominated by technical documentation and engineering design, with secondary focus on spatial planning and project management tasks such as design supervision and permit coordination.

  • Structural, civil, and technical engineering for gas transmission pipeline expansions, conversions, and connections, including compliance with technical regulations and client guidelines.

  • Spatial planning and integration of pipeline infrastructure into the existing spatial environment, including compliance with spatial legislation and administrative permits.

  • Design supervision during construction execution and coordination of administrative permits for pipeline projects.

How to take part

Who can apply

  • Legal or natural persons registered for the required activities
  • Consortia of legal or natural persons meeting the conditions
  • Compliance with spatial, environmental and technical legislation
  • Adherence to client's internal guidelines and standards

What to submit

  • Names and professional qualifications of personnel
  • Compliance with tender documentation requirements

Award criteria

  • Total tender value (95% weight)
  • Duration of project execution (5% weight)

Tender documents

The visible ZIP file is titled 'RD JN 24 2026.zip' and is linked directly from the tender page. Based on the filename and tender context, it likely contains the full tender documentation package, including contracts, technical specifications, spatial planning requirements and administrative conditions for the four-year pipeline expansion project. The file may also include forms for participation, questions and answers, and compliance checklists. However, the exact contents cannot be confirmed without accessing the file, and no size or detailed breakdown is provided.

Source

Published on eNaročanje. Original title: Izdelava prostorske in projektne dokumentacije ter izvajanje projektantskega nadzora za potrebe razvoja, dograditev, predelav in priključevanja objektov na prenosni plinovodni sistem za obdobje štiri.

Summary and assessment prepared by Pelenoir from the public notice (19 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.