About the project

Preparation of expert studies and documentation to support a decision on replacing the voltage system of the overhead contact line on Slovenia's public railway infrastructure.

Scope of work

Preparation of expert studies and technical documentation to evaluate the replacement of the overhead contact line voltage system on Slovenia's public railway infrastructure. The study will serve as the basis for a decision on system replacement.

Deliverables

  • Expert studies and technical documentation for voltage system replacement decision

Required services

Pelenoir assessment

This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING as it involves the preparation of expert technical studies and documentation for the evaluation of replacing the voltage system of the overhead contact line on Slovenia's railway infrastructure. The scope is focused on technical engineering and infrastructure planning without indications of architectural, urban, or other AEC disciplines.

  • Technical engineering studies and documentation for the evaluation and replacement of the overhead contact line voltage system on Slovenia's public railway infrastructure, including electrification system analysis and feasibility assessment.

How to take part

Who can apply

  • Requirements specified in tender documentation (Razpisna dokumentacija)

What to submit

  • Tender submission via electronic system (e-JN)
  • Documents as specified in tender documentation

Award criteria

  • Price (80%)
  • Quality (20%)

Tender documents

The visible ZIP file is titled 'Sprememba razpisne dokumentacije-01.zip,' suggesting it contains updated tender documentation. Based on the filename and tender context, it likely includes revised contractual terms, submission forms, and technical specifications for the railway electrification study. The file may also contain instructions for bidders, eligibility criteria, and evaluation guidelines. However, the exact contents cannot be confirmed without accessing the file, and no additional details about its structure or specific documents are provided.

Source

Published on eNaročanje. Original title: A-32/26; Izdelava strokovnih podlag za odločitev o zamenjavi sistema napetosti vozne mreže na javni železniški infrastrukturi.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 21 Sep 2026.