About the project

Development of an advanced RELAP model for the steam generator system and 3D CFD analysis of flow through the tube sheet at the Krško Nuclear Power Plant.

Scope of work

Deliverables

  • Advanced RELAP model of the steam generator system
  • 3D CFD analysis of flow through the tube sheet

Required services

Pelenoir assessment

This project is classified under the AEC business group ENGINEERING_AND_TECHNICAL_PLANNING, as its scope is focused on advanced technical engineering services, including the development of a RELAP model and 3D CFD analysis for a nuclear steam generator system. No other AEC business groups are supported by the extracted facts.

  • Development of an advanced RELAP model for the steam generator system and 3D CFD analysis of flow through the tube sheet, including structural and technical engineering simulations for nuclear infrastructure.

How to take part

Who can apply

  • Tender is suitable for small and medium-sized enterprises (SMEs)
  • Electronic submission of offers is mandatory

What to submit

  • Tender documentation as specified in the attached files
  • Offers must be valid for a minimum of 4 months

Award criteria

  • Price
  • Criteria specified in the tender documentation

Tender documents

The visible ZIP file is titled 'Izdelava naprednega RELAP modela BD sistema in 3D CFD analize.zip' and is likely to contain the full tender documentation for this procurement. This may include the technical specifications for the RELAP model and CFD analysis, contractual terms and conditions, and forms required for submission. The file is expected to outline the scope of work, evaluation criteria, and instructions for bidders. However, the exact contents cannot be confirmed without accessing the file, and no specific details about individual documents or drawings are visible.

Source

Published on eNaročanje. Original title: Izdelava naprednega RELAP modela BD sistema in 3D CFD analize pretoka BD sistema skozi cevno ploščo.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.