About the project

Framework agreement for HVAC (heating, ventilation, and air conditioning) design services for municipal and managed properties, including small functional and technical renovations, alterations, and maintenance projects. The agreement will be implemented through mini-competitions among selected suppliers for individual projects.

Scope of work

Framework agreement for HVAC design services for municipal and managed properties. The agreement will be implemented through mini-competitions among selected suppliers for individual projects. Suppliers must use SKOL classification-based hourly rates for pricing, and the most economically advantageous tender will be determined by a weighted comparison of these rates.

Deliverables

  • HVAC design plans and documentation for small functional and technical renovations, alterations, and maintenance projects

Required services

  • HVAC design (LVI-suunnittelu)
  • project-specific design tasks as defined per assignment

Pelenoir assessment

This project is a framework agreement for HVAC design services, explicitly covering technical engineering and building-services planning for municipal and managed properties. The scope is limited to HVAC-related design work, with no evidence supporting additional AEC business groups.

  • HVAC (heating, ventilation, and air conditioning) design services for municipal and managed properties, including technical renovations, alterations, and maintenance projects. This includes the preparation of HVAC design plans and documentation for individual projects under the framework agreement.

How to take part

Who can apply

  • Suppliers must submit required procurement documents as specified in the tendering terms
  • Framework agreement allows a maximum of 3 operators

What to submit

  • Tender submission via electronic means (esubmission required)
  • Documents must be submitted in Finnish

Award criteria

  • Most economically advantageous tender based on weighted comparison of SKOL-classified hourly rates (0.3 * Group 2 + 0.4 * Group 3 + 0.3 * Group 4)

Source

Published on HILMA. Original title: Aikaveloitusperusteinen LVI-suunnittelu v. 2027-2028, optio 2029-2030.

Summary and assessment prepared by Pelenoir from the public notice (25 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.