About the project

Engineering services for the preparation of regulatory dossiers (DUP and Environmental Authorisation) required for the upgrade of the RN57 national highway between La Main and La Vrine.

Scope of work

Preparation of regulatory dossiers (DUP and Environmental Authorisation) for the RN57 highway upgrade, including studies, documentation, and compliance with environmental and social criteria.

Deliverables

  • Dossier DUP (Déclaration d'Utilité Publique)
  • Dossier d'Autorisation Environnementale

Required services

  • engineering services
  • regulatory compliance
  • environmental impact assessment
  • project management

Pelenoir assessment

This project primarily involves engineering and technical planning for the preparation of regulatory dossiers (DUP and Environmental Authorisation) for a highway upgrade. Secondary aspects include urban design and planning to integrate the infrastructure into the regional context, as well as sustainability and building performance to address environmental compliance.

  • Preparation of technical engineering studies, structural and civil engineering assessments, and infrastructure planning required for the DUP and Environmental Authorisation dossiers for the RN57 highway upgrade.

  • Spatial planning and integration of the highway upgrade within the existing urban and regional context, including public-realm considerations and coordination with local planning regulations.

  • Environmental impact assessment, sustainability criteria, and compliance with environmental authorisation requirements for the highway upgrade.

How to take part

Who can apply

  • Open to all qualified tenderers under the open procedure
  • No reserved procurement

What to submit

  • Electronic submission required
  • Compliance with e-invoicing

Award criteria

  • Social criteria
  • Environmental criteria

Source

Published on BOAMP. Original title: Mission de maîtrise d'œuvre concernant les procédures réglementaires (Dossier DUP, Dossier d'Autorisation Environnementale) relative à l'opération d'aménagement de la RN57 entre La Main et La Vrine.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.