About the project

Reconstruction of the Rochelets wastewater treatment plant as part of the sanitation system in Saint-Brevin-les-Pins, including design and project management services.

Scope of work

Design and project management (MOE) services for the reconstruction of the Rochelets wastewater treatment plant, including technical, environmental, and cost evaluation criteria.

Deliverables

  • Design and project management documentation
  • Technical and environmental studies

Required services

  • Project management (maîtrise d'œuvre)
  • Design services
  • Technical studies
  • Environmental studies

Pelenoir assessment

The project involves the reconstruction of a wastewater treatment plant, with a primary focus on engineering and technical planning for sanitation infrastructure. Project management services are also required to coordinate design, technical studies, and environmental compliance, but these are secondary to the core engineering scope.

  • Design and technical planning for the reconstruction of the Rochelets wastewater treatment plant, including structural, civil, and infrastructure engineering for sanitation systems.

  • Project management and client representation for the reconstruction of the wastewater treatment plant, including coordination of design, technical studies, and environmental compliance.

How to take part

Who can apply

  • Compliance with exclusion grounds as per procurement documents
  • No reserved procurement

What to submit

  • Submission via electronic means (esubmission required)
  • Non-restricted tender documents in French (DOC 01)

Award criteria

  • Price (30% weight)
  • Technical value (50% weight)
  • Environmental value (20% weight)

Source

Published on BOAMP. Original title: MOE - Reconstruction de la station d'épuration des Rochelets - Système d'assainissement de Saint Brevin les Pins.

Summary and assessment prepared by Pelenoir from the public notice (9 Nov 2026). The original notice and its documents are binding. Page updated 8 Nov 2026.