Engineering · Service contract
Rénovation and compliance of elevators at Paris-Seine-Saint-Denis University Hospitals - Phase 3
Renovation, security upgrades for elevators, and compliance with SAE law at hospital facilities in Seine-Saint-Denis.
- Deadline
- 17 days left to apply
- Location
- Bobigny, France
About the project
Renovation, security upgrades for elevators, and compliance with SAE law at hospital facilities in Seine-Saint-Denis.
Scope of work
Full project management (maîtrise d'œuvre) for the renovation and security upgrade of elevators, including compliance with SAE law (sécurité des appareils élévateurs).
Deliverables
- Project management services for elevator renovation and compliance
Required services
- Project management (maîtrise d'œuvre)
- Technical studies for elevator systems (Étude d'installations de transport de personnes)
- Economic and financial assessment
Pelenoir assessment
This project primarily involves engineering and technical planning for the renovation and compliance of elevator systems in a hospital setting, with a secondary focus on project management to oversee the delivery of these services. The scope is centered on technical upgrades and regulatory compliance, supported by project coordination.
-
Engineering 70%
Technical engineering for the renovation, security upgrades, and compliance of elevator systems, including structural and mechanical assessments, infrastructure planning, and integration with existing hospital facilities.
-
Project management services, including coordination of technical studies, economic and financial assessments, and oversight of compliance with regulatory requirements for elevator systems.
How to take part
Who can apply
- Candidates must provide DC1 and DC2 forms or equivalent declarations
- Proof of compliance with employment laws for disabled workers (articles L. 5212-1 to L. 5212-11 of the French labor code)
- Technical capacity demonstrated through OPQIBI qualification 1501 or equivalent for elevator studies
- OPQTECC qualification or equivalent for economists
- Three references of similar projects completed in the last five years
- Site visit is mandatory (unless previously completed in the first consultation)
What to submit
- DC1 and DC2 forms or equivalent declarations
- Bank statements or proof of professional risk insurance
- Technical and financial capacity documentation
- Three project references with specified details (mission, budget, surface area, complexity, client name)
- Signed site visit bulletin (if not revisited)
- Electronic submission only via the original notice
Award criteria
- Technical value (including sustainable development): 60%
- Price: 40%
Source
Published on BOAMP. Original title: Mission de maîtrise d’œuvre pour l’opération : Rénovation, sécurisation des appareils élévateurs et mise en conformité loi SAE - Phase 3.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

