Engineering · Service contract
Reconstruction of Sully Bridge in Paris
Design and construction supervision (maîtrise d’œuvre) for the reconstruction of Sully Bridge in the 4th arrondissement of Paris.
- Deadline
- 3 days left to apply
- Location
- Paris, France
- Declared value
- EUR 1 m
About the project
Design and construction supervision (maîtrise d’œuvre) for the reconstruction of Sully Bridge in the 4th arrondissement of Paris.
Scope of work
Design and construction supervision services for the reconstruction of Sully Bridge, including fixed-price and unit-price components under a maximum threshold of 1,000,000 EUR excluding tax. The contract duration is 48 months from notification, with an indicative notification date of May 2027.
Deliverables
- Design and construction supervision (maîtrise d’œuvre) for bridge reconstruction
Required services
- Architectural and engineering design
- Construction supervision
- Project management
Pelenoir assessment
The project involves the reconstruction of Sully Bridge in Paris, with a primary focus on engineering and technical planning for the bridge's structural and civil design. Architectural design and project/construction management are also explicitly supported by the tender scope, reflecting a multidisciplinary approach to the infrastructure project.
-
Engineering 60%
Structural, civil, and technical engineering design for the reconstruction of Sully Bridge, including load-bearing calculations, material specifications, and infrastructure integration.
-
Architecture 20%
Architectural concept and design for the bridge, including aesthetic, functional, and urban integration aspects of the reconstruction.
-
Construction supervision, project management, and client representation during the bridge reconstruction, ensuring compliance with design and contractual requirements.
How to take part
Who can apply
- Compliance with exclusion grounds as per procurement documents
- No specific legal form required
- No reserved procurement
What to submit
- Electronic submission required
- Non-restricted documents referenced (règlement de la consultation)
Source
Published on BOAMP. Original title: Maîtrise d’œuvre des travaux de la reconstruction du pont Sully à Paris 4ème.
Summary and assessment prepared by Pelenoir from the public notice (25 Oct 2026). The original notice and its documents are binding. Page updated 25 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


