Engineering · Service contract
La Brosse-Montceaux drinking water treatment plant
Project management for a drinking water treatment plant means overseeing design and construction to meet water quality standards.
- Deadline
- 20 days left to apply
- Location
- La Brosse-Montceaux, Île-de-France, France
- Declared value
- EUR 197 600
About the project
Construction of a new drinking water treatment plant (usine de traitement d'eau potable) in La Brosse-Montceaux, including full engineering and project management services.
Why it matters
Project management for a drinking water treatment plant oversees design and construction to meet water quality standards for daily supply.
Scope of work
Full project management (maîtrise d'œuvre) for the design and construction of a new drinking water treatment plant in La Brosse-Montceaux, including all engineering services, regulatory compliance and site supervision.
Deliverables
- engineering studies
- detailed design
- construction supervision
- regulatory compliance documentation
Required services
- project management
- civil engineering
- process engineering
- hydraulic engineering
Pelenoir assessment
This project involves the design and construction of a drinking water treatment plant, primarily requiring engineering and technical planning for civil, process, and hydraulic systems, alongside project and construction management services for overall coordination and supervision.
-
Engineering 70%
Civil, process, and hydraulic engineering for the design and technical planning of the drinking water treatment plant, including structural, infrastructure, and building-services engineering.
-
Full project management (maîtrise d'œuvre), including construction supervision, regulatory compliance, and coordination of engineering deliverables.
How to take part
Who can apply
- refer to the consultation regulations (règlement de la consultation) for technical, economic and financial capacity requirements
Source
Published on BOAMP. Original title: Marché de maitrise d'œuvre pour la réalisation d'une usine de traitement d'eau potable sur la commune de La-Brosse-Montceaux..
Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

