About the project

Recruitment of a project management team (maîtrise d’œuvre) for the implementation of a drinking water supply master plan and urgent sanitation works in the Gevrey-Chambertin area.

Scope of work

Framework agreement for project management services (maîtrise d’œuvre) to implement a drinking water supply master plan and execute urgent sanitation works. The contract includes design, supervision, and coordination of construction activities.

Deliverables

  • Project management services for water and sanitation infrastructure
  • Implementation of a drinking water supply master plan (Schéma Directeur d’Alimentation en Eau Potable)
  • Supervision of urgent sanitation works

Required services

  • project management (maîtrise d’œuvre)
  • design and planning
  • construction supervision
  • coordination of water and sanitation infrastructure works

Pelenoir assessment

This project primarily involves engineering and technical planning for water and sanitation infrastructure, including the implementation of a drinking water supply master plan and urgent sanitation works. Additionally, it includes project and construction management services for supervision and coordination of the construction activities.

  • Design, planning, and technical engineering for drinking water supply infrastructure and sanitation works, including the implementation of a water supply master plan and supervision of urgent sanitation projects.

  • Coordination, supervision, and management of construction activities for water and sanitation infrastructure, ensuring compliance with project timelines and quality standards.

How to take part

Who can apply

  • Compliance with exclusion grounds as per procurement documents
  • No specific legal form required (CompanyLegalFormCode: false)
  • Electronic invoicing (eInvoicing) required

What to submit

  • Submission via electronic means (esubmission: required)
  • Compliance with procurement documents and selection criteria

Award criteria

  • Price (50% weight)
  • Technical value (40% weight)
  • Environmental measures (10% weight)

Source

Published on BOAMP. Original title: Accord-cadre relatif à la maitrise d’œuvre pour les travaux d’eau potable et d’assainissement collectif.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 29 Sep 2026.