Architecture · Design contest
Footbridge design: new Salztorbrücke linking Vienna’s 1st and 2nd districts
Design and general planning for a new footbridge (Salztorbrücke) connecting Vienna’s 1st and 2nd municipal districts, including structural engineering and architectural services.
- Deadline
- 95 days left to apply
- Location
- Vienna, Austria
About the project
Design and general planning for a new footbridge (Salztorbrücke) connecting Vienna’s 1st and 2nd municipal districts, including structural engineering and architectural services.
Scope of work
Design and general planning services for a new footbridge (Salztorbrücke) between Vienna’s 1st and 2nd districts, including architectural and structural engineering solutions. The competition aims to award a general planning contract to a team of architects and structural engineers.
Deliverables
- Competition submission with design proposals for the new footbridge
- General planning services for architectural and structural engineering
Required services
- Architectural design
- Structural engineering
- General planning
Pelenoir assessment
This project is a design competition for a new footbridge in Vienna, requiring both architectural and structural engineering expertise. The scope is evenly split between architectural design and technical engineering, with no evidence of additional disciplines such as urban planning, landscape, or interior design.
-
Architecture 50%
Architectural concept and design for the new Salztorbrücke footbridge, including aesthetic, functional, and urban integration aspects.
-
Engineering 50%
Structural engineering and technical planning for the footbridge, including load-bearing calculations, material specifications, and compliance with infrastructure standards.
How to take part
Who can apply
- Open to architects and structural engineers
- Teams combining both disciplines required
Tender documents
The visible document package includes PDF files labeled as 'Kooperationsschreiben + Jurynominierung der Kammer W/N/B' and 'EU-Bekanntmachung'. These likely contain the official competition brief, contractual conditions, jury nomination details, and EU procurement notice. The files may also include preliminary plans or drawings related to the footbridge design, though specific drawing contents cannot be confirmed without access. No ZIP archives or additional packages are observed. The exact scope of design requirements and submission guidelines remains uncertain without further context.
Source
Published on Architekturwettbewerb.at. Original title: 1., 2., Salztorbrücke - Neuplanung.
Summary and assessment prepared by Pelenoir from the public notice (17 Nov 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


