Architecture · Design contest
Footbridge and road bridge replacement over Danube Canal in Vienna
Design for the replacement of the Salztorbrücke, a bridge over the Danube Canal connecting Vienna's 1st and 2nd districts, accommodating pedestrians, cyclists and motorised traffic.
- Deadline
- 81 days left to apply
- Location
- Vienna, Austria
About the project
Design for the replacement of the Salztorbrücke, a bridge over the Danube Canal connecting Vienna's 1st and 2nd districts, accommodating pedestrians, cyclists and motorised traffic.
Scope of work
Design services for the replacement of the Salztorbrücke, including architectural, structural engineering and technical planning for a new bridge accommodating pedestrians, cyclists and motorised traffic.
Required services
- architectural services
- structural engineering services
- technical planning
Pelenoir assessment
The project involves the replacement of the Salztorbrücke in Vienna, requiring both architectural design and structural/technical engineering for a new bridge accommodating pedestrians, cyclists, and motorised traffic. The scope is evenly split between architectural concept work and engineering planning, with no evidence of other AEC disciplines such as interior design, urban planning, or construction management.
-
Architecture 50%
Architectural concept and design for the new Salztorbrücke, including form, aesthetics, and integration with the urban context of Vienna's 1st and 2nd districts.
-
Engineering 50%
Structural engineering and technical planning for the bridge, including load-bearing calculations, material specifications, and integration of pedestrian, cyclist, and motorised traffic requirements.
How to take part
Who can apply
- Submission requirements and eligibility criteria are detailed in the tender documents
What to submit
- Entries must be submitted in German
- Electronic submission required
Source
Published on Austrian Public Procurement Search. Original title: Neuplanung der Salztorbrücke in Wien.
Summary and assessment prepared by Pelenoir from the public notice (16 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


