Engineering · Service contract
Fire safety switch refurbishment design and cost documentation
Preparation of design and cost documentation for the refurbishment of fire safety power switches, including author supervision, for multiple Social Insurance Institution (ZUS) branch locations in the Greater Poland region.
- Deadline
- Closed 9 days ago
- Location
- Ostrów Wielkopolski, Wielkopolskie, Poland
- Declared value
- PLN 103 250 (≈ EUR 23 151)
About the project
Preparation of design and cost documentation for the refurbishment of fire safety power switches, including author supervision, for multiple Social Insurance Institution (ZUS) branch locations in the Greater Poland region.
Scope of work
Deliverables
- design documentation
- cost estimates
- author supervision services
Required services
- engineering design services
- cost estimation
- project supervision
- electrical installation design
Pelenoir assessment
This project is primarily focused on engineering and technical planning for the refurbishment of fire safety power switches, with a smaller component of project supervision. The scope does not support broader architectural, urban, or interior design disciplines, nor does it involve construction, sustainability, or digital delivery aspects beyond standard engineering documentation.
-
Engineering 90%
Design and technical planning for the refurbishment of fire safety power switches, including electrical engineering and fire safety system integration across multiple ZUS branch locations.
-
Author supervision during the implementation of the design to ensure compliance with the technical documentation and project requirements.
How to take part
Who can apply
- no exclusion under art. 108 ust. 1 and art. 109 ust. 1 pkt 1 and 4 of the Public Procurement Law
- no exclusion under art. 7 ust. 1 of the Act on special solutions for counteracting support for aggression against Ukraine
- consortium members must appoint a joint representative
What to submit
- completed offer form (załącznik nr 1 do SWZ)
- oświadczenie o zachowaniu poufności (confidentiality statement, załącznik nr 4 do SWZ) for access to restricted documents
- documents confirming representation authority (e.g., KRS, CEIDG extracts or power of attorney)
- oświadczenie, o którym mowa w art. 125 ust. 1 ustawy Pzp (declaration of no exclusion grounds, załącznik nr 2 do SWZ)
Award criteria
- lowest price (sole criterion)
Source
Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo-kosztorysowej wraz z pełnieniem nadzoru autorskiego dla zadań na przebudowę przeciwpożarowych wyłączników prądu.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
