About the project

Design and construction documentation for the expansion of an intersection between Provincial Road 213 and County Road 1509G in Starzyno, including author supervision during construction. The project aims to improve traffic safety and capacity through geometric changes, pedestrian and cycling paths, drainage, lighting, and traffic organization adjustments.

Scope of work

Comprehensive design documentation for the expansion of an intersection, including obtaining all necessary permits (ZRID decision), author supervision during construction, and updates to documentation based on implementation feedback. The project includes geometric redesign, pedestrian and cycling infrastructure, drainage, lighting, and traffic organization adjustments.

Deliverables

  • concept design (due 1 month after contract signing)
  • complete building permit design and ZRID application (due 13 months after contract signing)
  • complete execution design (due 15 months after contract signing)
  • author supervision during construction (optional)
  • updated technical design reflecting construction changes (optional)

Required services

  • civil engineering design (road infrastructure)
  • author supervision during construction
  • obtaining ZRID decision and other permits
  • cost estimate updates
  • response to contractor queries during construction tender

Pelenoir assessment

The project primarily involves engineering and technical planning for the expansion of a road intersection, including geometric redesign, drainage, and lighting. Secondary scope includes project and construction management tasks such as author supervision and permit coordination.

  • Civil engineering design for the geometric redesign of the intersection, including road infrastructure, drainage, lighting, and traffic organization adjustments to improve safety and capacity.

  • Author supervision during construction, updates to design documentation based on implementation feedback, and coordination of permit processes (e.g., ZRID decision).

How to take part

Who can apply

  • execution of at least 2 similar road design projects (class Z or higher) with ZRID applications in the last 5 years
  • designated road engineer with unlimited design qualifications and experience in 2 similar ZRID projects
  • compliance with Polish construction law and professional chamber requirements

What to submit

  • documents in Polish
  • electronic submission via designated procurement platform
  • compliance with technical requirements for electronic communication (Internet access, supported browsers)

Award criteria

  • Price (60%)
  • Length of warranty for design documentation (10%)
  • Experience of designated road design engineer (30%)

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej wraz z pełnieniem nadzoru autorskiego dla zadania pn.: „Rozbudowa skrzyżowania dr. wojewódzkiej nr 213 z dr. powiatową nr 1509G w m. Starzyno”..

Summary and assessment prepared by Pelenoir from the public notice (31 Oct 2026). The original notice and its documents are binding. Page updated 30 Oct 2026.