About the project

Design of emergency power connections for portable generators, including modernization of existing connections to integrate automatic transfer switches (SZR) at two municipal healthcare facilities in Toruń: a specialist hospital and a nursing-care facility. The project includes site surveys, noise impact analysis, compliance with fire safety regulations, and preparation of construction-ready documentation (PZT, PAB, PT).

Scope of work

Design services for emergency power connections at two municipal healthcare sites. Key tasks include: site inventory and survey of existing electrical installations; noise propagation analysis; preparation of construction documentation (PZT, PAB, PT) with fire safety approvals; site layout concepts for generator storage; compliance with environmental protection (DNSH) and nature conservation regulations; and coordination with utility providers. The design must avoid proprietary product references and ensure material equivalence.

Deliverables

  • Construction design documentation (PZT, PAB, PT)
  • Site inventory report of existing electrical installations
  • Noise impact analysis report
  • Site layout concept for generator storage (with client approval)
  • Dendrological inventory (if required after site analysis)
  • Environmental protection and nature compensation plan (if tree removal is necessary)
  • Technical specifications for materials and equipment (without proprietary references)

Required services

  • Architectural and engineering design services
  • Electrical engineering services
  • Site survey and inventory
  • Environmental impact assessment (noise, nature conservation)
  • Fire safety compliance documentation
  • Coordination with utility providers and authorities

Pelenoir assessment

This project is primarily an engineering and technical planning endeavor focused on designing emergency power connections for municipal healthcare facilities. The scope includes electrical engineering, site surveys, and technical documentation, with secondary elements of sustainability (noise and environmental compliance) and project management (coordination and regulatory compliance).

  • Design of emergency power connections, including modernization of existing electrical installations to integrate automatic transfer switches (SZR), site surveys, noise impact analysis, fire safety compliance, and preparation of construction-ready documentation (PZT, PAB, PT).

  • Noise impact analysis and compliance with environmental protection (DNSH) and nature conservation regulations, including preparation of a nature compensation plan if tree removal is necessary.

  • Coordination with utility providers and authorities, compliance with fire safety regulations, and oversight of the design process to ensure alignment with municipal requirements.

How to take part

Who can apply

  • Contractors must comply with Polish Public Procurement Law (art. 94 ustawy)
  • Contractors must submit a declaration of no exclusion grounds (art. 125 ust. 1 ustawy)
  • Key personnel must have experience in designing emergency power connections with automatic transfer switches (SZR) or network-generator switches

What to submit

  • Electronic offer via the e-Procurement Platform the original notice
  • Signed offer form
  • Power of attorney (if applicable)
  • Declaration of no exclusion grounds (Załącznik Nr 3 do SWZ)
  • Statement on use of proprietary references (if applicable)
  • Consortium agreement (if applicable)
  • Confidentiality statement (if applicable)

Award criteria

  • Price (60% weight)
  • Experience of personnel assigned to the project: at least one completed design service for emergency power connections with SZR or network-generator switch (40% weight)

Source

Published on e-Zamowienia. Original title: Projekt realizacji awaryjnego przyłącza dla agregatów wraz z uwzględnieniem modernizacji przyłącza dla dostosowania do SZR dla SSM przy ul. Batorego 17-19 oraz ZPO w Toruniu przy ul. Ligi Polskiej 8.

Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.