About the project

Architect-led integrated design team to prepare Development Control Plans for three HSE hospitals in Cork: Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital.

Scope of work

Preparation of Development Control Plans for three HSE hospitals by an architect-led integrated design team. Services include architectural, engineering and related design services.

Deliverables

  • Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital

Required services

Pelenoir assessment

The project involves the preparation of Development Control Plans for three healthcare facilities, primarily requiring architectural design and coordination, supported by engineering and urban design/planning disciplines. The scope is dominated by architectural services, with secondary contributions from technical engineering and masterplanning.

  • Architectural concept, building design, and overall coordination of the Development Control Plans for the three hospitals, ensuring alignment with healthcare facility requirements and masterplanning objectives.

  • Structural, civil, and building-services engineering required for the Development Control Plans, including infrastructure and technical systems integration for healthcare facilities.

  • Masterplanning and spatial planning for the hospital sites, including site development, access, and public realm integration within the Development Control Plans.

How to take part

Award criteria

  • Most Economically Advantageous Tender (MEAT)

Source

Published on Irish eTenders. Original title: `HSE Estates SW: Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 1 Sep 2026.