Architecture · Service contract
Development Control Plans for Bantry, St. Finbarr’s and Mallow General Hospitals
Architect-led integrated design team to prepare Development Control Plans for three HSE hospitals in Cork: Bantry General Hospital, St.
- Deadline
- Closed 50 days ago
- Location
- Cork, Ireland
About the project
Architect-led integrated design team to prepare Development Control Plans for three HSE hospitals in Cork: Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital.
Scope of work
Preparation of Development Control Plans for three HSE hospitals by an architect-led integrated design team. Services include architectural, engineering and related design services.
Deliverables
- Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital
Required services
- architectural services
- engineering services
- integrated design team coordination
Pelenoir assessment
The project involves the preparation of Development Control Plans for three healthcare facilities, primarily requiring architectural design and coordination, supported by engineering and urban design/planning disciplines. The scope is dominated by architectural services, with secondary contributions from technical engineering and masterplanning.
-
Architecture 60%
Architectural concept, building design, and overall coordination of the Development Control Plans for the three hospitals, ensuring alignment with healthcare facility requirements and masterplanning objectives.
-
Engineering 30%
Structural, civil, and building-services engineering required for the Development Control Plans, including infrastructure and technical systems integration for healthcare facilities.
-
Masterplanning and spatial planning for the hospital sites, including site development, access, and public realm integration within the Development Control Plans.
How to take part
Award criteria
- Most Economically Advantageous Tender (MEAT)
Source
Published on Irish eTenders. Original title: `HSE Estates SW: Development Control Plans for Bantry General Hospital, St. Finbarr’s Hospital and Mallow General Hospital.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 1 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



