Tenders of Europe project card: New business school building with integrated design team lead by architect, Cork, Ireland
Featured in the daily edition, 20 Nov 2026

About the project

Procurement of an integrated design team to deliver a new business school building on Perrott’s Avenue, University College Cork. The team will be led by an architect and include civil and structural engineering, mechanical and electrical engineering, project supervisor design process, and energy efficient design coordination services.

Why it matters

An architect leading an integrated design team for a university building turns circulation and adaptability into the first quiet rules of daily use.

The tender for a new business school building at University College Cork names an architect. Not a project manager. As the lead of the integrated design team.

This structure turns architectural expertise into the quiet backbone of the entire project, from circulation to adaptability, long before the first lecture begins.

Scope of work

Appointment of an integrated design team led by an architect to provide consultancy services for the new Cork University Business School building. Required services include architectural, civil and structural engineering, mechanical and electrical engineering, project supervisor design process, and energy efficient design coordination. Quantity surveying services are excluded and will be procured separately.

Deliverables

  • Integrated design team services for new business school building

Required services

  • Architectural services
  • Civil and structural engineering services
  • Mechanical and electrical engineering services
  • Project supervisor design process (PSDP)
  • Energy efficient design coordination (EED)

Pelenoir assessment

The project involves the procurement of an integrated design team for a new business school building, with a primary focus on architectural design and leadership. Secondary disciplines include engineering and technical planning for structural, civil, mechanical, and electrical aspects, as well as project and construction management for design process supervision and energy efficiency coordination.

  • Architectural concept, building design, and overall design leadership for the new business school building, including coordination of the integrated design team.

  • Civil and structural engineering, mechanical and electrical engineering, and technical coordination to support the building's design and construction.

  • Project supervision design process (PSDP) and coordination of energy-efficient design to ensure compliance and integration with the overall project.

How to take part

Award criteria

  • Most Economically Advantageous Tender (MEAT)

Source

Published on Irish eTenders. Original title: Appointment of Integrated Design Team for Cork University Business School New Building.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.