About the project

Planning, tender preparation, technical coordination and project support for the adaptation and expansion of baggage handling systems as part of the redesign of Check-in Island 0 in Terminal 3 at Vienna Airport.

Scope of work

Planning, preparation of tender documents, technical coordination and project-specific support for the adaptation and expansion of baggage handling technology in the context of the redesign of Check-in Island 0 at Terminal 3.

Deliverables

  • planning documents
  • tender preparation documents
  • technical coordination reports
  • project support documentation

Required services

  • technical planning for industrial processes and production workflows
  • tender preparation
  • technical coordination
  • project-specific support

Pelenoir assessment

This project primarily involves technical engineering and planning for the adaptation and expansion of baggage handling systems within an airport terminal redevelopment. Secondary support includes project management tasks such as tender preparation and coordination.

  • Technical planning, coordination, and adaptation of baggage handling systems, including industrial process design and production workflow optimization for the redevelopment of Check-in Island 0.

  • Project-specific support, tender preparation, and coordination to ensure the integration of technical planning with overall project execution and timeline adherence.

How to take part

Who can apply

  • suitable for small and medium-sized enterprises (SMEs)

What to submit

  • offers must be submitted in German
  • electronic submission required

Source

Published on Austrian Public Procurement Search. Original title: Planer Fördertechnik D-8380 Umbau Check-in-Insel 0, Terminal 3.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 2 Oct 2026.