About the project

Planning services for the air and climate specialist contribution for the western section of the S8 Marchfeld Expressway between the S1/S8 interchange and the Gänserndorf junction, as part of an ongoing complaint procedure.

Scope of work

Preparation of the specialist air and climate contribution for the western section of the S8 Marchfeld Expressway, including planning services for environmental impact assessment as part of an ongoing complaint procedure.

Deliverables

  • Fachbeitrag Luft und Klima (specialist air and climate contribution)

Required services

  • environmental planning
  • air quality assessment
  • climate impact analysis
  • engineering consultancy

Pelenoir assessment

The project is primarily an engineering and technical planning assignment for the western section of the S8 Marchfeld Expressway, with a focus on air quality and climate impact analysis as part of an environmental planning process. The scope also includes sustainability and building performance aspects, particularly in assessing the environmental effects of the highway infrastructure.

  • Technical planning and engineering consultancy for air quality assessment and climate impact analysis related to the highway infrastructure, including environmental impact assessment and specialist contributions.

  • Specialist contributions focused on air and climate impacts, including environmental sustainability and performance analysis for the highway section.

How to take part

Who can apply

  • Open to architecture and engineering firms with relevant experience
  • Submissions must be in German
  • Electronic submission required via www.provia.at

What to submit

  • Offers must remain valid for 3 months
  • Electronic submission of documents (.pdf, .xls, .onlv, etc.)

Award criteria

  • Price (net total price as per documents)
  • Quality (offered quality as per documents)

Tender documents

The visible document package includes a ZIP archive named 'AU_Luft_Klima_S8West.zip,' likely containing the core tender documents for the air and climate planning services. The archive may include environmental impact assessments, technical specifications, and planning drawings related to air quality and climate analysis for the highway section. A file labeled 'Dokumentenupload (.pdf, .xls' suggests the presence of submission templates or forms, possibly in Excel format. The exact contents of the ZIP file cannot be confirmed without access, but the filenames indicate a focus on environmental planning deliverables.

Source

Published on Austrian Public Procurement Search. Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Luft und Klima im anhängigen Beschwerdeverfahren Planungsphase EP.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.