About the project

Planning and tendering of tunnel ventilation systems including risk analysis and construction traffic management for Phase 4 of the renewal of two motorway tunnels originally opened in 2004.

Scope of work

Deliverables

  • planning documents for tunnel ventilation systems
  • tender documents for ventilation upgrade
  • risk analysis report
  • construction traffic management plans

Required services

  • technical planning for mechanical and electrical building installations
  • risk analysis
  • preparation of tender documents

Pelenoir assessment

This project focuses on the planning and tendering of tunnel ventilation systems for motorway tunnels, primarily involving mechanical and electrical engineering for ventilation upgrades. A secondary aspect involves construction traffic management to ensure safe and efficient operations during the upgrade. The scope is dominated by technical engineering planning, with limited project management requirements.

  • Technical planning for tunnel ventilation systems, including mechanical and electrical engineering, risk analysis, and preparation of tender documents for the upgrade.

  • Construction traffic management planning and coordination during the tunnel ventilation upgrade.

How to take part

Who can apply

  • bidders may form consortia of up to two members
  • required professional experience and qualifications as specified in tender documents

What to submit

  • tender documents in German
  • electronic submission required via www.provia.at
  • documents in formats such as PDF, XLS, ONLV

Award criteria

  • price (net total price as per documents)
  • quality (offered quality as per documents)
  • reference projects (person-related)
  • training and professional experience
  • personnel development
  • gender parity

Tender documents

The visible document package includes two ZIP archives: '6013_INTU_BiNi_P4_Lüftung_Basisdokumente.zip' and '6013_INTU BiNi_P4_Lüftung_Beilagen.zip'. These likely contain the core tender documents, technical plans, and specifications for the tunnel ventilation planning and risk analysis. The first ZIP is probably larger and may include baseline technical documentation, while the second may hold supplementary materials such as appendices, forms, or additional technical details. A file type reference to XLS suggests the presence of spreadsheets, possibly for pricing, schedules, or submission forms. The exact contents of the ZIP files cannot be confirmed without access, and no specific drawing or document titles are visible beyond the archive names.

Source

Published on Austrian Public Procurement Search. Original title: 6013 INTU BiNi Phase 4 - Planung & Ausschreibung Tunnellüftung inkl. Risikoanalyse.

Summary and assessment prepared by Pelenoir from the public notice (19 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.