About the project
Framework agreement for consulting, studies, project management assistance and design services in infrastructure, roads, utilities, hydraulics, urban planning, landscaping and building sectors for the municipality of Cerbère.
Why it matters
Cerbère’s framework wants a designer who speaks infrastructure. The work spans roads, utilities and buildings—each a thread in the town’s fabric.
Scope of work
Consulting, studies, project management assistance (AMO) and design (MOE) services for municipal projects in infrastructure, roads, utilities, hydraulics, urban planning, landscaping and building sectors. Framework agreement executed via purchase orders.
Deliverables
- technical studies
- project management assistance
- design services
- urban planning documents
- infrastructure plans
- landscaping designs
- building designs
Required services
- engineering consulting
- project management assistance (assistance à maîtrise d’ouvrage)
- design services (maîtrise d’œuvre)
- urban planning
- hydraulic engineering
- landscaping design
- infrastructure design
Pelenoir assessment
This framework agreement covers a broad range of municipal services, primarily focused on engineering and technical planning for infrastructure, roads, utilities, and hydraulics. It also includes significant components of urban planning, landscape architecture, and building design, reflecting a multidisciplinary scope for municipal development projects.
-
Engineering 40%
Technical engineering, infrastructure design, roads, utilities, and hydraulic engineering for municipal projects, including structural and civil engineering services.
-
Urban planning documents, spatial planning, and public-realm planning for municipal development projects.
-
Architecture 20%
Building design and architectural concept development for public buildings and municipal facilities.
-
Landscaping design, open-space planning, and outdoor-environment design for municipal projects.
How to take part
Who can apply
- Compliance with French public procurement regulations
- No exclusion grounds (épuration des candidatures)
- Electronic submission required via designated platform
- e-invoicing required for contract execution
- Electronic signatures required for submissions
What to submit
- Tender documents via electronic submission platform
- Electronic signature on submissions
- Compliance with selection criteria and exclusion grounds
Award criteria
- Price (40% weight)
- Technical quality (50% weight)
- Environmental criteria (10% weight)
Source
Published on BOAMP. Original title: Missions de conseils - études-assistance à maîtrise d’ouvrage et maîtrise d’œuvre dans les domaines infrastructures-voirie-réseaux divers-hydraulique-urbanisme-paysage-bâtiment.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 7 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

