Engineering · Service contract
Bicycle path design at railway crossing on County Road 1029F in Niedoradz
Preparation of construction design documentation for a bicycle path along County Road 1029F near a railway crossing in Niedoradz, including obtaining necessary permits and approvals for the project.
- Deadline
- Closed 19 days ago
- Location
- Nowa Sól, Lubusz, Poland
About the project
Preparation of construction design documentation for a bicycle path along County Road 1029F near a railway crossing in Niedoradz, including obtaining necessary permits and approvals for the project.
Scope of work
Preparation of construction design documentation for a bicycle path along County Road 1209F in Niedoradz, including pedestrian and cyclist separation from vehicular traffic near a railway crossing, design of a cyclist lock, and obtaining all necessary permits and approvals (ZRID).
Deliverables
- construction design documentation (projekt budowlany)
- detailed design documentation (projekt wykonawczy)
- obtaining final and binding construction permit or notification (pozwolenie / zgłoszenie robót)
Required services
- engineering design services for road infrastructure
- permitting and approval coordination
Pelenoir assessment
The project primarily involves engineering and technical planning for the design of a bicycle path infrastructure, including road and railway crossing integration. A secondary focus is on urban design and planning to ensure the path's spatial integration with existing transport networks and public spaces.
-
Engineering 80%
Design of the bicycle path infrastructure, including structural and technical planning for the railway crossing, road integration, and cyclist lock system. Coordination of engineering solutions to ensure compliance with Polish road and construction standards.
-
Integration of the bicycle path into the existing urban and transport network, including spatial planning for pedestrian and cyclist separation from vehicular traffic near the railway crossing. Coordination with local urban planning requirements and public-realm considerations.
How to take part
Who can apply
- Minimum 1 completed design documentation for a county or higher-class road of at least 1.0 km in the last 5 years
- Design team must include a road design engineer with unlimited design qualifications under Polish construction law and experience in at least 1 similar road design project in the last 5 years
What to submit
- List of completed design services (referencje)
- List of personnel assigned to the project with qualifications and experience details
- Power of attorney if submitting as a consortium
Award criteria
- Price (60% weight)
- Completion time (40% weight, maximum 30 days, minimum 20 days)
Source
Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej budowy ścieżki rowerowej w obrębie przejazdu kolejowego w ciągu drogi powiatowej nr 1029F ul. Kochanowskiego w Niedoradzu.
Summary and assessment prepared by Pelenoir from the public notice (31 Oct 2026). The original notice and its documents are binding. Page updated 30 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.