Bergen Pyrolysis Pre-Project Study
Feasibility study to assess the potential for pyrolysis technology in Bergen, including local resource utilization, waste reduction, and value creation.
- Deadline
- 92 days left to apply
- Location
- Bergen, Vestland, Norway
- Declared value
- NOK 1 m (≈ EUR 93 153)
About the project
Feasibility study to assess the potential for pyrolysis technology in Bergen, including local resource utilization, waste reduction, and value creation. The study will cover raw materials, applications, technological solutions, environmental impacts, and pilot project opportunities, but will not include detailed design or construction of a pyrolysis plant.
Scope of work
Feasibility study for pyrolysis technology in Bergen, including assessment of raw materials, applications, technological solutions, environmental impacts, and potential for pilot projects. The study will not include detailed design or construction of a pyrolysis plant.
Deliverables
- Feasibility study report on pyrolysis potential in Bergen
- Assessment of local raw materials and applications
- Evaluation of technological solutions and environmental impacts
- Recommendations for pilot projects and collaboration models
Required services
- Energy efficiency consulting (ENØK-rådgivning)
- Feasibility studies
- Waste management consulting
- Environmental management and auditing
Pelenoir assessment
This project is a feasibility study focused on assessing the potential of pyrolysis technology for waste reduction and resource utilization in Bergen. The scope primarily involves specialist consulting for environmental and technological evaluation, with a secondary focus on sustainability aspects. No architectural, engineering, or construction design work is included.
-
Assessment of pyrolysis technology feasibility, including raw material utilization, technological solutions, environmental impacts, and pilot project opportunities for Bergen.
-
Sustainability 30%
Evaluation of environmental impacts, energy efficiency, and sustainability aspects of pyrolysis technology applications in Bergen.
How to take part
Who can apply
- References on specified works may be required as selection criteria
What to submit
- Tender documents must be submitted electronically in Norwegian
- Missing documentation may exceptionally be submitted later at the buyer's discretion
Source
Published on Doffin. Original title: BME FOR 2026-05 Forprosjekt Pyrolyse.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 18 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.