About the project

Preparation of design and cost documentation for air conditioning installation in a ZUS (Social Insurance Institution) building, including author's supervision during implementation. The project aims to improve indoor climate control in the specified facility.

Scope of work

Preparation of design and cost documentation for air conditioning installation, including author's supervision. The project must comply with accessibility requirements for disabled persons and universal design principles.

Deliverables

  • Design documentation for air conditioning installation
  • Cost estimate documentation
  • Author's supervision during implementation

Required services

  • Engineering design services for mechanical and electrical building installations
  • Project preparation and cost estimation
  • Project and documentation supervision

Pelenoir assessment

This project is primarily focused on engineering and technical planning for the design of an air conditioning installation in a public building, with a secondary component of project supervision during implementation. The scope is explicitly technical and does not extend to architectural design, urban planning, or other AEC disciplines.

  • Design and technical planning of the air conditioning installation, including mechanical and electrical engineering for climate control systems in the ZUS building.

  • Author's supervision during the implementation phase to ensure compliance with the design documentation and project requirements.

How to take part

Who can apply

  • No exclusion under art. 108 ust. 1 and art. 109 ust. 1 pkt 1 and 4 of the Polish Public Procurement Law
  • No exclusion under art. 7 ust. 1 of the Act on special solutions for counteracting support for aggression against Ukraine
  • Compliance with confidentiality requirements for restricted documents

What to submit

  • Completed offer form (załącznik nr 1 do SWZ)
  • Statement on exclusion grounds (art. 125 ust. 1 of the Polish Public Procurement Law)
  • Documents confirming authorization to represent the bidder
  • Confidentiality statement for restricted documents (załącznik nr 4 do SWZ)
  • Documents for consortium members if applicable

Award criteria

  • Lowest price

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo kosztorysowej wraz z pełnieniem nadzoru autorskiego dla zadania pod nazwą: "Wykonanie instalacji klimatyzacji – I/Rawicz”.