About the project

Preparation of workshop drawings and cost calculations for the arrangement of safe access areas within the Krško Nuclear Power Plant (NEK).

Scope of work

Preparation of workshop drawings and cost calculations for safe access arrangements within the Krško Nuclear Power Plant. The contract includes design services for load-bearing structures and related documentation.

Deliverables

  • workshop drawings
  • cost calculations

Required services

  • design services for load-bearing structures

Pelenoir assessment

This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING due to its focus on the preparation of workshop drawings and technical calculations for load-bearing structures and safe access arrangements within a nuclear facility. No other AEC business groups are explicitly supported by the extracted scope.

  • Preparation of workshop drawings and technical calculations for load-bearing structures and safe access arrangements within the nuclear power plant.

How to take part

Who can apply

  • Electronic submission of offers is mandatory
  • Tender is suitable for small and medium-sized enterprises (SMEs)

What to submit

  • Tender documents must be submitted electronically

Award criteria

  • Price (Skladno z RD)

Tender documents

The visible document package consists of a single ZIP file labeled 'RD.zip.' Based on the filename and tender context, this archive likely contains the full tender documentation, including contractual terms, technical specifications, and submission forms. The exact contents remain uncertain without downloading the file, but the label 'RD' (possibly 'Razpisna Dokumentacija' or tender documentation) suggests it includes all necessary materials for preparing and submitting an offer. No other file types or sizes are declared in the source context.

Source

Published on eNaročanje. Original title: Izdelava delavniških risb in kalkulacij za ureditev varnih dostopov znotraj NEK.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 7 Oct 2026.