About the project

Maintenance, upkeep, and potential expansion of the existing mountain bike trail network in the Wienerwald region, including trail management services.

Scope of work

Deliverables

  • maintenance and upkeep of mountain bike trails
  • potential expansion of the trail network
  • trail management services

Required services

  • trail maintenance and upkeep
  • trail network management
  • use of Wegemanagement software Contwise-Infra

Pelenoir assessment

This project primarily involves the technical and engineering aspects of maintaining and expanding a mountain bike trail network, including infrastructure planning and execution. Landscape architecture is a secondary discipline, focusing on the outdoor environment and ecological integration of the trails. Project and construction management is also relevant for coordinating maintenance activities and ensuring compliance with regional requirements.

  • Technical planning, structural engineering, and infrastructure development for the maintenance, upkeep, and potential expansion of the mountain bike trail network, including trail stabilization, drainage, and signage systems.

  • Design and integration of outdoor trail environments, including natural terrain adaptation, planting, erosion control, and landscape restoration to ensure ecological compatibility and user experience.

  • Coordination of trail maintenance and expansion activities, including scheduling, contractor oversight, cost management, and compliance with regional requirements.

How to take part

Who can apply

  • suitable for small and medium-sized enterprises (SMEs)

What to submit

  • offers must be submitted in German
  • electronic submission required

Award criteria

  • knowledge of the region and mountain bike trail network (15% weighting)
  • maintenance concept (10% weighting)
  • knowledge of Wegemanagement software Contwise-Infra (5% weighting)
  • offer price (70% weighting)

Source

Published on Austrian Public Procurement Search. Original title: Wienerwald Tourismus GmbH-Streckenmanagement & Erweiterung Mountainbike Netz Wienerwald.

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.