Tenders of Europe project card: Vestland Light Rail Design Framework Agreement, Bergen, Norway
Featured in the daily edition, 23 Oct 2026

About the project

Establishment of parallel framework agreements for multidisciplinary design, engineering, third-party verification and independent control services for light rail, infrastructure and associated facilities in all project phases.

Why it matters

Vestland’s light-rail framework turns infrastructure into the first public promise of mobility for the region.

Vestland’s framework agreement covers multidisciplinary design, engineering, and independent control for light rail and associated facilities across all project phases.

This isn’t just a technical brief. It’s the first public story of how the region will move. Visible to commuters, businesses, and the communities it connects.

Scope of work

Framework agreements for multidisciplinary design, engineering, third-party verification, independent control, BIM, digital collaboration and specialist services across all project phases for light rail, infrastructure, buildings, bridges, tunnels and technical systems. Services include architecture, landscape, environment, HSE/SHA, structural engineering, railway engineering and project management.

Deliverables

  • design and engineering documentation
  • third-party verification reports (NS standards)
  • independent control reports (pbl standards)
  • BIM models and digital collaboration outputs
  • resource availability plans per discipline
  • methodology statements for project execution
  • pricing schedules per staff category

Required services

  • architectural design
  • structural engineering
  • railway engineering
  • landscape architecture
  • environmental management
  • HSE/SHA services
  • BIM coordination
  • digital collaboration
  • project management
  • third-party verification
  • independent control

Pelenoir assessment

The project is a multidisciplinary framework agreement for the design, engineering, and verification of light rail infrastructure and associated facilities in Bergen, Norway. The scope is dominated by architectural design and engineering disciplines, with additional support from landscape architecture, BIM coordination, project management, and specialist consulting services such as third-party verification and environmental management.

  • Architectural design for light rail stations, associated buildings, and infrastructure elements such as bridges and tunnels.

  • Structural engineering, railway engineering, and technical planning for light rail infrastructure, bridges, tunnels, and technical systems.

  • Landscape design for open spaces, stations, and outdoor environments associated with the light rail infrastructure.

  • BIM coordination, digital collaboration, and delivery of digital models for multidisciplinary design and engineering.

  • Project management, client representation, and coordination of multidisciplinary design and engineering services across all project phases.

  • Third-party verification, independent control, environmental management, and HSE/SHA services for compliance and quality assurance.

How to take part

Who can apply

  • open to suppliers in the EEA
  • capacity to handle call-offs with short response times
  • ability to provide resources across all specified disciplines
  • experience in transport infrastructure and light rail projects

What to submit

  • completed pricing schedule document
  • resource coverage matrix per discipline
  • methodology statement (max 3 pages for execution, max 4 pages for resource capacity)
  • organisational plan showing discipline coverage
  • electronic submission via designated platform

Award criteria

  • Price (35–45%) – evaluated based on weighted staff category rates
  • Delivery capacity and resource availability per discipline (20–30%) – assessed through resource matrix and organisational plan
  • Task understanding and execution methodology (25–35%) – evaluated through methodology statement

Source

Published on Doffin. Original title: R06 Rammeavtale for prosjekteringstjenester.

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.