About the project

Urban and pre-operational studies for the restructuring of the ZIL Nord industrial and logistics zone in Maizières-lès-Metz, including preliminary studies, project definition, consolidation, and preparation of regulatory and environmental procedures.

Scope of work

Urban and pre-operational studies for the restructuring of the ZIL Nord zone, including preliminary studies (firm tranche), project consolidation and operational preparation (optional tranche 1), and preparation of regulatory and environmental procedures (optional tranche 2).

Deliverables

  • Preliminary studies and project definition (firm tranche)
  • Consolidation of the urban project and operational preparation (optional tranche 1)
  • Preparation and accompaniment of regulatory and environmental procedures (optional tranche 2)

Required services

  • Urban planning
  • Architectural and urban design
  • Environmental engineering
  • Infrastructure technical design (roads, networks, platforms, signage)
  • Regulatory and environmental procedure support

Pelenoir assessment

This project focuses on urban and pre-operational studies for the restructuring of an industrial zone, with a primary emphasis on urban design and planning. Secondary disciplines include landscape architecture for outdoor spaces and engineering for infrastructure and environmental procedures, reflecting a multidisciplinary approach to the zone's redevelopment.

  • Urban design, masterplanning, and spatial planning for the restructuring of the ZIL Nord industrial and logistics zone, including project definition, consolidation, and operational preparation.

  • Technical design for infrastructure (roads, networks, platforms, signage) and environmental engineering support for regulatory and environmental procedures.

  • Landscape design and integration for the outdoor spaces, public realms, and green areas within the restructured industrial zone.

How to take part

Who can apply

  • Architect-urbanist registered with the Order of Architects
  • Landscape architect
  • Environmental engineering expertise
  • Technical design office for infrastructure
  • Turnover from the last three years
  • Three similar references from the last five years for each co-contractor
  • Detailed human resources allocated to the operation

Award criteria

  • Environmental criteria

Source

Published on BOAMP. Original title: MISSION D'ÉTUDES URBAINES ET PRÉOPÉRATIONNELLES RELATIVE A LA RESTRUCTURATION DE LA ZIL NORD A MAIZIERES-LES-METZ.

Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 26 Nov 2026.