About the project

Extension, requalification and densification of business parks through preliminary studies and full masterplanning and design services.

Scope of work

Two lots: (1) preliminary and complementary studies for business park expansion, requalification and densification; (2) full masterplanning and design services for the same sites. Both lots cover a 4-year period.

Deliverables

  • preliminary studies
  • complementary studies
  • masterplanning and design documentation

Required services

Pelenoir assessment

This project focuses on the expansion, requalification, and densification of business parks, with a primary emphasis on masterplanning and urban design. Architectural design and engineering studies are also explicitly required, supporting a multi-disciplinary scope.

  • Masterplanning for the expansion, requalification, and densification of business parks, including spatial planning and public-realm integration.

  • Architectural design for the new and upgraded business park sites, including building concepts and site layout.

  • Engineering studies for infrastructure, civil works, and technical planning related to the business park expansion.

How to take part

Who can apply

  • selection criteria defined in procurement documents
  • e-invoicing required
  • performance conditions apply

What to submit

  • electronic submission required

Award criteria

  • social criteria
  • environmental criteria

Source

Published on BOAMP. Original title: Missions d'études et de maîtrise d'œuvre pour l'extension, la requalification et la densification des parcs d'activités.

Summary and assessment prepared by Pelenoir from the public notice (19 Nov 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.