Technical and economic analysis for new biogas plant at GOŚ ŁAM
Consultancy service to conduct a technical and economic analysis for the construction of a new biogas plant at the GOŚ ŁAM site, including the presentation of an optimal implementation variant based on the provided concept document.
- Deadline
- Closed 43 days ago
- Location
- Łódź, Łódzkie, Poland
About the project
Consultancy service to conduct a technical and economic analysis for the construction of a new biogas plant at the GOŚ ŁAM site, including the presentation of an optimal implementation variant based on the provided concept document.
Scope of work
Consultancy service to perform a technical and economic analysis for the construction of a new biogas plant, including risk assessment and presentation of the optimal implementation variant based on the provided concept document (Koncepcja Instalacji fermentacji metanowej w miejscowości Pabianice).
Deliverables
- Technical and economic analysis report
- Risk assessment for the biogas plant project
- Optimal implementation variant for the biogas plant construction
Required services
- feasibility studies
- technical consultancy
- economic analysis
- project preparation and cost estimation
- executability analysis
Pelenoir assessment
The project involves a consultancy service for conducting a technical and economic analysis of a new biogas plant, focusing on feasibility, risk assessment, and optimal implementation. The primary AEC business group is specialist consulting, with secondary relevance to sustainability and building performance due to the renewable energy focus of the project.
-
Conducting technical and economic analysis, feasibility studies, risk assessment, and presenting the optimal implementation variant for the biogas plant project.
-
Sustainability 20%
Assessing sustainability aspects, energy performance, and renewable energy integration for the biogas plant project.
How to take part
Who can apply
- Contractor must demonstrate experience in conducting at least three economic analyses (with risk assessments) for renewable energy projects (minimum 1.5 MWe capacity) within the last five years, including at least two analyses specifically for biogas plants (minimum 1.5 MWe capacity).
- Contractor may not use the same project/installation to fulfill multiple experience requirements.
What to submit
- Offers must be submitted electronically via the designated procurement platform.
- Documents must be prepared in Polish.
- Required documents include a list of services performed in the last five years to demonstrate eligibility.
Award criteria
- Price (100% weight)
Source
Published on e-Zamowienia. Original title: Przeprowadzenie analizy techniczno-ekonomicznej przedsięwzięcia polegającego na budowie nowej biogazowni na terenie GOŚ ŁAM.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 7 Oct 2026.