Specialist consulting · Service contract
Spoorzone HLMR Environmental Impact Assessment
Preparation and process management of a plan-MER (environmental impact assessment) for the Spoorzone area in Haarlemmermeer, part of the larger infrastructure program 'Weg om de Zuid' aimed at improving accessibility.
- Deadline
- 41 days left to apply
- Location
- Hoofddorp, Netherlands
About the project
Preparation and process management of a plan-MER (environmental impact assessment) for the Spoorzone area in Haarlemmermeer, part of the larger infrastructure program 'Weg om de Zuid' aimed at improving accessibility. The deliverables include a complete, consistent, and tender-ready contract dossier for the subsequent integrated UAV-GC execution contract.
Scope of work
Selection of one contractor to prepare and process-manage a plan-MER (environmental impact assessment) for the Spoorzone area. The contractor must deliver a complete, tender-ready contract dossier, including an elaborated requirements management system, contract design, necessary studies, and contract documents for the subsequent integrated UAV-GC execution contract.
Deliverables
- plan-MER (environmental impact assessment)
- contract dossier (tender-ready)
- requirements management system
- contract design
- necessary studies and investigations
- contract documents for execution contract
Required services
- environmental impact assessment
- process management
- engineering consultancy
- contract preparation
Pelenoir assessment
This project is primarily focused on the preparation and process management of an environmental impact assessment (plan-MER) for an infrastructure development area, supported by the creation of a tender-ready contract dossier. The scope includes specialist consulting for environmental planning and contract preparation, with secondary technical engineering tasks such as studies and contract design.
-
Preparation and process management of the plan-MER (environmental impact assessment), including the development of a complete, tender-ready contract dossier for the subsequent UAV-GC execution contract.
-
Engineering 30%
Technical studies, investigations, and contract design required to support the environmental impact assessment and ensure the contract dossier is execution-ready for infrastructure development.
How to take part
Who can apply
- Selection criteria specified in tender documents
- No reserved participation
What to submit
- Electronic submission required
- Submission in Dutch
- No electronic catalogues allowed
- No variants allowed
Award criteria
- Price (30 points)
- Plan of approach (vision) (30 points)
- Approach, methodology, and risks (30 points)
- Team deployment and continuity (10 points)
Tender documents
The visible document package includes PDF and DOCX files related to the tender for the Spoorzone HLMR environmental impact assessment. The files likely contain the official tender notice, a concept agreement for the plan-MER, guidelines for the environmental impact assessment process, and various annexes such as tender forms, reference project models, and declarations of competence. The ZIP file appears to bundle all documents for download. The exact content of the files cannot be confirmed without access, but the filenames suggest detailed contractual, procedural, and technical requirements for the plan-MER process.
Images from the tender documents
Source
Published on TenderNed. Original title: MER Spoorzone HLMR.
Summary and assessment prepared by Pelenoir from the public notice (12 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.