About the project

Design documentation for the construction of a new water supply network in the streets Działkowa, Woronieckiego, and Słoneczna in Swarożyn, replacing outdated asbestos-cement and steel pipes with a ring-system network to improve reliability and pressure.

Scope of work

Preparation of comprehensive multi-discipline technical documentation for the construction of a new water supply network, including design solutions, obtaining necessary permits, cost estimates, and technical specifications for execution and acceptance of construction works.

Deliverables

  • construction design or site development project
  • cost estimates and investor's budget
  • technical specifications for execution and acceptance of construction works
  • obtained construction permits or building notifications with no objections
  • as-built documentation and author's supervision records

Required services

  • engineering design services for water supply networks
  • civil and hydraulic engineering design
  • pipeline design
  • preparation of cost estimates and technical specifications
  • obtaining administrative permits and approvals
  • author's supervision during construction

Pelenoir assessment

This project is primarily an engineering and technical planning endeavor focused on the design of a new water supply network, including hydraulic, civil, and pipeline engineering. Secondary aspects involve project and construction management tasks such as cost estimation, permit acquisition, and author's supervision.

  • Design of a new water supply network, including hydraulic engineering, pipeline routing, pressure calculations, material selection, and technical specifications for construction and acceptance. This also includes structural and civil engineering aspects related to the network infrastructure.

  • Preparation of cost estimates, investor's budget, technical specifications for execution and acceptance, obtaining construction permits, and author's supervision during construction.

How to take part

Who can apply

  • compliance with Polish Public Procurement Law (art. 125 ust. 1)
  • valid registration in the National Court Register or Central Register of Economic Activity
  • no grounds for exclusion under art. 109 ust. 1 pkt 4, 5, 7 of the Public Procurement Law

What to submit

  • offer using the interactive form on the e-Zamówienia platform
  • statement on absence of exclusion grounds (Załącznik nr 2 do SWZ)
  • power of attorney for representation (if applicable)
  • documents confirming professional qualifications and experience of the designated designer

Award criteria

  • Price (60%)
  • Professional experience of the designer (40%)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla zadania: ,,Budowa sieci wodociągowej w ulicach: Działkowa, Woronieckiego i Słoneczna w miejscowości Swarożyn’’.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.