About the project

Development of technical and economic documentation for a sustainable urban mobility corridor, including feasibility studies, technical designs, cadastral documentation, and expropriation support for streets Plevnei, Garofiței, Depozitelor, and Industriei in Zalău Municipality.

Scope of work

Development of technical-economic documentation for a sustainable urban mobility corridor, including feasibility studies with DALI elements, technical designs (DTAC/DTAD, DTOE, PT+DE), cadastral documentation, expropriation support, and BIM-compliant deliverables.

Deliverables

  • Feasibility study with DALI elements and general cost estimate
  • Topographic survey (OCPI-approved)
  • Geotechnical study and other terrain studies
  • Traffic study
  • Street lighting study and energy audit
  • Documentation for urbanism certificate, approvals, and permits (including environmental and water management)
  • Documentation for utility coexistence, protection, or relocation
  • Documentation for land occupation, property identification, and legal regime of affected properties
  • Expropriation corridor and cadastral documentation
  • Property valuation report and compensation tables
  • DNSH analysis, climate resilience analysis, horizontal principles, NEB, and BIM/method equivalent
  • Urbanism certificate and required approvals
  • Technical documentation for construction/demolition authorization (DTAC/DTAD)
  • Execution organization documentation (DTOE)
  • Technical project and execution details (PT+DE)
  • Specialty specifications, memos, drawings, quantity lists, cost estimates, F1-F6 forms, and health/safety plans
  • BIM-compliant documentation (openBIM format)

Required services

  • Feasibility studies
  • Technical design for transport infrastructure
  • Cadastral documentation
  • Urban planning services
  • Construction consulting
  • BIM management

Pelenoir assessment

The project is primarily an urban mobility infrastructure initiative requiring multidisciplinary AEC expertise. The dominant disciplines are urban design and planning (street layout, public realm, urbanism documentation) and engineering (transport infrastructure, technical designs, geotechnical studies). Secondary but critical components include surveying and geomatics (cadastral documentation, topographic surveys), sustainability (climate resilience, DNSH, energy audits), and BIM/digital delivery (openBIM compliance). The scope does not support architecture, interior design, construction contracting, or real estate development as primary focuses.

  • Urban design and spatial planning for the sustainable mobility corridor, including street layout, public realm integration, traffic flow optimization, and coordination of urban infrastructure elements.

  • Technical engineering for transport infrastructure, including road design, geotechnical studies, traffic studies, street lighting, utility coexistence, and construction/demolition authorization documentation (DTAC/DTAD, DTOE, PT+DE).

  • Surveying 15%

    Topographic surveying, cadastral documentation, property identification, and geodata management for land occupation, expropriation, and legal regime analysis of affected properties.

  • Climate resilience analysis, DNSH (Do No Significant Harm) assessment, energy audits, and sustainability integration for the mobility corridor, including NEB (New European Bauhaus) principles.

  • BIM management, digital coordination, and openBIM-compliant documentation for the technical and execution phases of the project.

How to take part

Who can apply

  • Registration in a commercial register (or equivalent for foreign operators)
  • Experience in similar projects: minimum 1,500,000 RON cumulative value in the last 3 years (max 3 contracts) for DALI, SF, PT, or PT+DE phases for urban streets or similar infrastructure
  • Key experts: BIM Manager (with national certification, COR 121312), road engineer (CFDP specialization), and topographic engineer (ANCPI/OCPI Category A or D authorization)
  • No exclusion grounds under Art. 167 of Law 98/2016 (e.g., environmental/social/labor violations, bankruptcy, professional misconduct)

What to submit

  • DUAE (Declaration on Oath) completed in SEAP
  • Technical proposal including methodology, work plan, and personnel organization
  • CVs for key experts (BIM Manager, road engineer, topographic engineer) with supporting documents (recommendations, signed drawings, etc.)
  • Certificates of good execution or equivalent for similar projects
  • Participation guarantee (16,000 RON)
  • Association agreement (if applicable) with role distribution and payment modality
  • Subcontracting agreements (if applicable)
  • Third-party support commitments (if applicable)
  • Documents in Romanian (or authorized translations)

Award criteria

  • Price (40% weight): lowest price receives maximum points; others scored proportionally
  • BIM Manager experience (15% weight): 5 points for 2 projects, 10 for 3-4, 15 for 5+
  • Road engineer experience (10% weight): 3 points for 2 projects, 7 for 3-4, 10 for 5+
  • Topographic engineer experience (10% weight): 3 points for 2 projects, 7 for 3-4, 10 for 5+
  • Methodology (10% weight): 5 points (limited understanding), 7 (partial), 10 (comprehensive)
  • Personnel organization (10% weight): 5 points (poor correlation), 7 (partial), 10 (full correlation)
  • Work plan (5% weight): 2 points (poor), 4 (partial), 5 (full correlation)

Source

Published on SEAP. Original title: Servicii de elaborare a documentaţiei tehnico-economice, faza SF cu elemente de DALI, DTAC/DTAD, DTOE, PT+DE și documentații cadastrale pentru „Coridor de mobilitate urbană durabilă: str. Plevnei, str. Garofiței, legătura cu str. Depozitelor, str. Depozitelor și str. Industriei din Municipiul Zalău”.

Summary and assessment prepared by Pelenoir from the public notice (22 Oct 2026). The original notice and its documents are binding. Page updated 21 Oct 2026.